Connecticut Department of Transportation

05/07/2026 | Press release | Distributed by Public on 05/07/2026 14:35

Electrical Maintenance on I-95 in Bridgeport Fairfield and Stratford

Electrical Maintenance on I-95 in Bridgeport Fairfield and Stratford

5/07/2026

The Connecticut Department of Transportation (CTDOT) is announcing that electrical maintenance will be performed on I-95 between Exits 31-24 in Bridgeport. This project is scheduled to occur on Friday, May 15 and be completed on Sunday, May 17, 2026. Permit 3027656 consists of electrical maintenance over I-95 in Bridgeport.

This project is being performed by United Illuminating.

LANE CLOSURE/DETOUR INFO

There will be various lane closures along with rolling roadblocks on Route 8 southbound from Exit 2 B to the I-95 merge and I-95 north and southbound between Exits 31-24 in Bridgeport, Fairfield, and Stratford from Friday, May 15 to Sunday, May 17, 2026 from 9:00 p.m. to 5:00 a.m. Traffic control signing patterns State Troopers, and Crash Units will guide motorists through the work zone.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.

Media Contact:

Connecticut Department of Transportation published this content on May 07, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 07, 2026 at 20:35 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]