CEZ a.s.

09/25/2026 | Press release | Distributed by Public on 09/24/2026 23:52

Information on NPP DUKOVANY 25/09/2026

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 - power operation, Reactor power is 100 %, Turbine generator output - 510 MWe
Unit 2 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 3 - power operation, Reactor power is 99,7 %, Turbine generator output - 504 MWe
Unit 4 - power operation, Reactor power is 100 %, Turbine generator output - 511 MWe

Electricity production since the beginning of the year: 10 376 967 MWh.

CEZ a.s. published this content on September 25, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on September 25, 2026 at 05:52 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]