02/05/2026 | Press release | Distributed by Public on 02/05/2026 04:24
On 31 January 2026, at approximately 9:45 CET, an incident occurred in the Ukrainian and Moldovan power systems leading to significant outages and system separation from Continental Europe.
he separated area was resynchronised with the Continental European system at 10:05 CET. Ukrenergo and Moldelectrica immediately activated the system restoration procedures with the support of the neighbouring TSOs. The restoration of electricity supply to all consumers was well coordinated between Ukrenergo, Moldelectrica and the distribution system operators.
Further analysis is ongoing.
For more information, please contact [email protected]
ENTSO-E, the European Network of Transmission System Operators for Electricity, is the association for the cooperation of the European transmission system operators (TSOs).
The 40 member TSOs, representing 36 countries, are responsible for the secure and coordinated operation of Europe's electricity system, the largest interconnected electrical grid in the world. In addition to its core, historical role in technical cooperation, ENTSO-E is also the common voice of TSOs.
Press contact: [email protected]