Roadway Activity Report for the Lower East and Upper Cumberland (July 23-29, 2026)

BLEDSOE COUNTY SR-30 (STATE HWY. 30) Utility Work both directions from LM 12.22 to LM 13.43: Flagger-assisted lane closures on SR-30 (HWY 30) between Sureguard Storage and Dunlap Stone Inc. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/13/2026 through 07/17/2026 from 9 am - 2 pm [2026-212]

BRADLEY COUNTY SR-40 [1.1-5.1] from McKamy Street N.E. to Lyles Road resurfacing: During this reporting period, the contractor will continue pavement marking work on SR-40. Lane closures will be necessary when workers are present. Motorists should use caution and reduce speed when traveling through the work zone. [APAC - Atlantic, Inc./Cleveland/CNZ289]

BRADLEY COUNTY SR-60 (25TH ST. N.W.) Utility Work both directions at LM 16.03: Flagging-assisted lane closures on SR-60 (25th Street NW) at the intersection of Peerless and 25th St. NW. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 07/20/2026 through 07/29/2026 from 9 am - 2 pm [2026-535]

BRADLEY COUNTY SR-74 [0-9.11] from Georgia-Tennessee State Line to SR-313 resurfacing: During this reporting period, the contractor will continue resurfacing work on SR-74. Lane closures will be necessary during daytime hours when workers are present. Traffic will be reduced to one lane with flaggers while work is being performed. Motorists should use caution and reduce speed when traveling through the work zone. [Talley Construction Company, Inc./Cleveland/CN26202]

BRADLEY COUNTY SR-74 [11.445-11.83] from Whaley Road to SR-60 APD-40 drainage improvements: During this reporting period, the contractor will continue punch list work on SR-74. Intermittent flagging operations and shoulder closures will be necessary periodically. Motorists should use caution and reduce speed when traveling through the work zone. [APAC - Atlantic, Inc./Cleveland/CNZ243]

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY The installation of Weigh-in-Motion technology at 28 sites on various Interstate and State Routes: No Region 2 lane closures this week on CNX913. [Davis H. Elliot Construction Company, Inc./Maint - R2/CNX913]

CANNON COUNTY SR-145 [0-9.67] from SR-1 (US-70S) to SR-96 micro surfacing: The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing-related operations. [Asphalt Paving Systems, Inc./McMinnville/CN26200]

CANNON COUNTY SR-53 [18.21-24.08] from near Pleasant Ridge Road to Dekalb County line resurfacing: The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing-related operations. [Tinsley Asphalt, LLC/McMinnville/CN26202]

CANNON COUNTY SR-64 [0-9.12] from the Coffee County Line to SR-1 (US-70S) resurfacing (micro surface): The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing-related operations. [Asphalt Paving Systems, Inc./McMinnville/CN26201]

CANNON COUNTY SR-99 [0-1.37] from the Rutherford County Line to SR-64 resurfacing (micro surface): The contractor will have lane closures with flagging operations during daylight hours from 6 AM to 8 PM for resurfacing-related operations. [Asphalt Paving Systems, Inc./McMinnville/CN26201]

CLAY COUNTY SR-52 [23.6-26.6] from near Poor House Road to Overton County Line resurfacing and bridge repair: There will be intermittent lane closures for the duration of the work. Flaggers will be used as needed to control traffic through the work zone. Motorists are encouraged to use caution, follow signage and traffic control devices, and watch for construction equipment and personnel throughout the project. [Asphalt Paving Systems, Inc./Livingston/CN26200]

COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving: Drivers can expect short-term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone. [Jones Bros. Contractors, LLC/Tullahoma/CNZ029]

COFFEE COUNTY SR-280 (MCBRIDE BRANCH RD.) Utility Work both directions from LM 0.0 to LM 3.65: Flagger-assisted lane closures on SR-280 (McBride's Branch Rd.) between Hollow Creek Lane and Ferrells Branch Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/13/2026 through 07/17/2026 from 8 am to 4:30 pm [2026-400]

COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St., LM 2.6) in Tullahoma: Phase 2 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. Lanes will be reduced from 3 lanes to 2, with one lane in each direction throughout the project length. Drivers can expect intermittent flagging operations for construction operations and vehicles entering and exiting the work zone. [Dement Construction Company, LLC/Tullahoma/CNX912]

COFFEE COUNTY SR-55 [2.8-7.35] from near South Washington Street to north of HP Womack Road resurfacing: There will be nightly lane closures from 7 PM to 6 AM for resurfacing operations. One lane in each direction will be maintained at all times. [Volunteer Highway Supply Co., Inc./Tullahoma/CN26203]

CUMBERLAND COUNTY I-40 [304.4-306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing: Construction continues within the median of I-40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting the work zone. [Rogers Group, Inc./Crossville/CNZ290]

CUMBERLAND COUNTY SR-101 (LANTANA RD.) Utility Work both directions from LM 7.44 to LM 9.10: Flagging-assisted lane closures on SR-101 (Lantana Rd.) between Vandever Rd. and Flynn's Cove Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present 07/14/2026 from 9 am - 2 pm [2024-515]

CUMBERLAND COUNTY SR-24 [0-0.16] from Putnam County Line to C189 bridge repair: The contractor continues working on the bridge repair on I-40 at MM 304.6 or SR-24 at LM 0.24. The contractor has reduced SR-24 to one lane with temporary signals. Motorists should use caution in the area. [Rogers Group, Inc./Crossville/CNZ290]

CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement: The contractor has closed SR-24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR-462 and SR-1. The contractor will be working on general clearing activities and utility work initially. Once initial work is completed, the contractor will proceed with the replacement of the bridge over the Obed River. Motorists should use caution and utilize the posted detour. RESTRICTIONS: Both lanes of SR-24 are closed at LM 15.06 to LM 15.6. [Mid-State Construction Company, Inc./Crossville/CNZ206]

CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. The contractor has shifted traffic from near I-40 to near Tabor Loop. The contractor has closed Lawson Road with a detour posted to utilize Tabor Road. Temporary lane closures and/or periodic traffic stoppages may be necessary for construction activities. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change. [Jones Bros. Contractors, LLC/Crossville/CNV009]

CUMBERLAND COUNTY SR-28 [12.61-14.96] from near SR-392 to near US-70 resurfacing: The contractor has started resurfacing activities on SR-28 (Main Street) from SR-392 (Miller Ave.) to near SR-24 (Elmore Rd.). The typical work schedule will be nightly from Sunday night through Saturday morning from 7 PM to 6 AM. Temporary lane closures and flaggers are to be utilized within the construction zone. Motorists should be aware of the work zone and seek alternate routes as needed. [Rogers Group, Inc./Crossville/CNZ291]

CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): Traffic has been shifted to the new alignment from US-127 (SR-28) LM 29.2 in Cumberland County near N. Lowe Rd. to LM 1.87 in Fentress County near Little Rd. Traffic will be restricted to two lanes. Flaggers are being used intermittently as needed to control traffic through the work zone. Motorists are encouraged to use caution, be aware of new traffic signs and pavement markings, and watch for construction equipment and personnel throughout the project.
[Jones Bros. Contractors, LLC/Cookeville/CNV300]

DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor is continuing work near the intersection of SR-26 and SR-53. During this work, lane closures may be used, and flaggers will be present to facilitate the flow of traffic through the work zone. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway. [Twin K Construction/Cookeville/CNV012]

DEKALB COUNTY SR-26 [15.9-20.3] from Near Old Snow Hill Road to West of Curtis Road resurfacing: The contractor will be continuing concrete curb work throughout the project. During this work, the contractor will potentially have one lane closed in each direction. Motorists should be prepared to stop as they approach the work zone and should be aware of construction equipment adjacent to the roadway. [Rogers Group, Inc./Cookeville/262008]

DEKALB COUNTY SR-56 (COOKEVILLE HWY.) Utility Work both directions from LM 15.38 to LM 17.32: Flagger-assisted lane closures on SR-56 (Cookeville Hwy.) between Craft Center Dr. and Hurricane Bridge. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 04/30/2026 through 08/28/2026 from 9 am to 2 pm [2025-216]

FRANKLIN COUNTY SR-15 (COWAN RD.) Utility Work both directions from LM 3.86 to LM 20.96: Flagger-assisted lane closures on SR-15 (Cowan Hwy.) between Cumberland St. and College St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/13/2026 through 07/24/2026 from 9 am to 2 pm [2025-817]

FRANKLIN COUNTY SR-16 (US-41A) Utility Work both directions from LM 8.45 to LM 11.78: Flagger-assisted lane closures on SR-16 (Bypass Rd.) starting at Petty Lane through Peabody Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/13/2026 through 07/24/2026 from 9 am - 2 pm [2025-818]

FRANKLIN COUNTY SR-476 (MANSFORD RD.) Utility Work both directions from LM 0.04 to LM 5.05: Flagger-assisted lane closures on SR-476 (Mansford Rd.) between Lynchburg Rd. and Boswell Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/27/2026 through 08/07/2026 from 9 am to 2 pm [2025-860]

FRANKLIN COUNTY SR-50 (LYNCHBURG HWY.) Utility Work both directions from LM 6.89 to LM 7.06: Flagger-assisted lane closures on SR-50 (Bypass Rd.) at the Lynchburg Rd. and Mansford Rd. exchange. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/27/2026 through 08/07/2026 from 9 am - 2 pm [2025-859]

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: No interstate ramp/lane closures are scheduled for this period. If needed, the contractor may utilize short-duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris, or repairing guardrail, attenuators, etc.
[Wright Brothers Construction Company, Inc./Maj Prj - Blevins/DB2101]

HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound and southbound, Shallowford Road entrance ramps, Shallowford Road exit ramps, and the Hamilton Place Mall exit ramp. Hamilton Loop Road is closed for retaining wall construction and storm drainage installation between the intersections near Markman's Jewelers and Texas Roadhouse. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted from 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
[Summers-Taylor, Inc./Chattanooga West/CNX358]

HAMILTON COUNTY SR-148 (LOOKOUT MTN. SCENIC HWY.) Utility Work both directions at LM .72: Flagger-assisted lane closures on SR-148 (Scenic Hwy.) between 1885 Suck Creek Rd. and 2422 Suck Creek Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present on 07/21/2026 from 9 am - 2 pm [2026-490]

HAMILTON COUNTY SR-17 [5.63-8.75] from Campbell Street to SR-153 resurfacing: Beginning 07/09/2026, the contractor will perform flagging operations at Wilder, Stuart, Wilhoit, and Frost Streets along SR-17 from LM 5.63 to LM 8.75 between 9 AM and 5 PM for the construction of concrete curb ramps.
[Wright Brothers Construction Company, Inc./Chattanooga West/CN26202]

HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions at LM 15.26: Flagger-assisted lane closures on SR-2 (Brainerd Rd.) between Greenway View Dr. and Chickamauga Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/27/2026 from 9 am - 2 pm [2026-230]

HAMILTON COUNTY SR-27 (SUCK CREEK RD.) Utility Work both directions from LM 1.38 to LM 1.41: Flagger-assisted lane closures on SR-27 (Hwy. 27 Suck Creek Rd.) between Franklin Rd. and Fleetwood Dr. West. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/16/2026 from 9 am - 2 pm [2026-423]

HAMILTON COUNTY SR-317 (APISON PK.) Utility Work both directions at LM 5.59: Flagger-assisted lane closures on SR-317 (Apison Pike) between Old Lee Hwy. and Pattentown Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/17/2026 from 9 am - 2 pm [2026-375]

HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 9.74: Flagger-assisted lane closures on SR-319 (Hixson Pike) between Farmstand Dr. and Jackson Mill Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/16/2026 through 07/17/2026 from 9 am - 2 pm [2026-284]

HAMILTON COUNTY SR-320 (E. BRAINERD RD.) Utility Work both directions from LM .54 to LM .59: Flagger-assisted lane closures on SR-320 (E. Brainerd Rd.) between Osborn Dr. and Central Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/23/2026 through 07/27/2026 from 9 am - 2 pm [2026-026]

HAMILTON COUNTY SR-320 [0.86-1.11] replacement of bridge over CSX railroad: Beginning 07/09/2026, the contractor will commence clearing operations on SR-320 from LM 0.86 through LM 1.11 and will perform daily flagging operations from 7 AM to 5 PM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
[Dement Construction Company, LLC/Chattanooga West/CNZ267]

HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work both directions from LM 1.43 to LM 1.44: Flagger-assisted lane closures on SR-8 (Ringgold Rd.) between Truman St. and Prater Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/16/2026 through 07/21/2026 from 9 am - 2 pm [2026-375]

HAMILTON COUNTY SR-8 (SIGNAL MOUNTAIN BLVD.) Utility Work both directions from LM 16.28 to LM 16.32: Flagger-assisted lane closures on SR-8 (Signal Mountain Blvd.) from Shoal Creek Rd. to Palisades Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/27/2026 through 07/28/2026 from 9 am - 2 pm [2026-142]

HAMILTON COUNTY SR-8 [5.04-5.27] from 5.04 to 5.27 Bachmann Tubes tunnel cleaning: The Bachman Tunnel will be closed 07/23/2026 from 8 PM to 6 AM for cleaning. A detour will be in effect during the closures to direct traffic to alternative routes. This work is weather permitting.
[Diamond Specialized, Inc./Chattanooga West/CN26203]

JACKSON COUNTY SR-290 [10.58-12.55] from SR-56 to Putnam County Line resurfacing: The contractor will be on site intermittently performing punch list work. During this work, lane closures may be used, and flaggers and temporary traffic control devices will be in place to facilitate the flow of traffic through the work zone. Motorists should approach the work zone with caution and should be prepared to stop. [Rogers Group, Inc./Cookeville/262029]

MARION COUNTY I-24 Utility Work both directions from MM 160.2 to MM 166.6: Law enforcement-assisted rolling roadblock between TVA Road and Slygo Rd. Message boards, signage, and law enforcement vehicles will be present. Motorists should be aware of personnel and equipment, reduce speed, and be prepared to stop. 07/12/2025 between 6:00 am and 9:00 am. (2026-060)

MARION COUNTY I-24 [17.61-21.76] resurfacing from near SR-27 (US-72) to east of SR-28: The contractor will be resurfacing on I-24 in both directions from MM 152.2 to MM 156. The work will be performed Sunday nights through Thursday nights from 7 PM - 6 AM. Single lane closures will be set up, leaving one lane open to traffic during work hours. Tennessee Highway Patrol will be on site to assist with traffic control.
[Rogers Group, Inc./Dunlap/CNZ292]

MARION COUNTY SR-108 [2.8-3.24] slide mitigation: The contractor will be performing slide mitigation operations, including grading, drainage, and paving on SR-108 in Marion County at LM 2.8. The roadway will be reduced to one lane controlled by temporary traffic signals. The project completion date is 08/31/2027. Please use caution when driving through the work zone.
[Wright Brothers Construction Company, Inc./Dunlap/CNZ226]

MARION COUNTY SR-27 [2.73-4.22] from 2.73 to 4.22 resurfacing with cold in-place recycling (CIR): The contractor will be performing resurfacing operations on SR-27 from north of SR-56 (LM 2.7) to I-24 (LM 4.2) in South Pittsburg. This work will require single-lane closure controlled by flaggers. Please use caution when driving through the work zone.
[Tinsley Asphalt, LLC/Dunlap/CN26200]

MARION COUNTY SR-283 [2.69-8.11] from 2.69 to 8.11 resurfacing with Cold In-Place Recycling (CIR): The contractor will be performing resurfacing operations on SR-283 from near SR-27 (LM 2.69) to the Sequatchie County line (LM 8.11). This work will require single-lane closure controlled by flaggers. Please use caution when driving through the work zone.
[Road Worx, Inc./Dunlap/CNZ188]

MCMINN COUNTY I-75 [39-43.2] from MM 39 to MM 43.2 resurfacing: During this reporting period, the contractor will continue resurfacing work on I-75 in McMinn County between MM 39 and MM 43.2. This work will require nightly lane closures from 7 PM to 6 AM Sunday night through Saturday morning. Motorists should use caution when traveling through the work zone and be aware of the presence of workers and equipment.
[Wright Brothers Construction Company, Inc./Cleveland/CNZ328]

MCMINN COUNTY SR-30 [0-5] from Meigs-McMinn County Line to East of County Road 166 resurfacing: During this reporting period, the contractor will continue pavement marking work on SR-30. Lane closures will be in place during working hours. Motorists should use caution and reduce speed when traveling through the work zone.
[Rogers Group, Inc./Cleveland/CNZ904]

MCMINN COUNTY SR-307 [0-1.95] from SR-30 to Tellico Ave resurfacing: Beginning 06/08/2026 through 08/31/2026, the contractor will commence asphalt milling operations. Expect flagging operations between 6 AM and 8 PM. Motorists should use caution, pay attention to construction signage, and watch for construction vehicles and personnel.
[Rogers Group, Inc./Chattanooga West/CN26203]

MCMINN COUNTY SR-39 (LIBERTY HILL RD.) Utility Work both directions from LM 16.81 to LM 17.87: Flagger-assisted lane closures on SR-39 (Liberty Hill Road) between Tellico Junction Road and Burger Branch Road. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/29/2026 from 9:30 pm to 6:00 am [2025-132]

OVERTON COUNTY SR-111 (W. MAIN ST.) Utility Work both directions from LM 10.12 to LM 11.14: Flagger-assisted lane closures on SR-111 (West Main St.) between Rickman Rd. and Evans St. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 06/18/2026 through 09/18/2026 from 9 am - 2 pm [2026-577]

OVERTON COUNTY SR-52 [0-0.33] from the Clay County Line to west of Robbins Lane resurfacing: There will be intermittent lane closures for the duration of the work. Flaggers will be used as needed to control traffic through the work zone. Motorists are encouraged to use caution, follow signage and traffic control devices, and watch for construction equipment and personnel throughout the project.
[Asphalt Paving Systems, Inc./Livingston/CN26200]

POLK COUNTY SR-68 over SR-40 the construction of bridges: During this reporting period, the contractor will continue construction on the SR-68 South bridge. All SR-68 traffic will use the newly constructed SR-68 North bridge while construction occurs on the new SR-68 South bridge. All SR-40/SR-68 interchange traffic will utilize the SR-68 North interchange ramps. A temporary 3-way stop has been implemented at the intersection of the SR-40 interchange ramp and SR-68. Motorists are encouraged to slow down when entering the construction zone and look out for new stop signs on SR-68 near the SR-40/SR-68 interchange.
[Wright Brothers Construction Company, Inc./Cleveland/CNZ042]

PUTNAM COUNTY I-40 [303.6-304.2] from MM 303.6 to MM 304.2 bridge repair and resurfacing: Construction continues within the median of I-40. Traffic has been shifted along the project route. Motorists should use caution in the area and be aware of construction vehicles entering and exiting the work zone. [Rogers Group, Inc./Crossville/CNZ290]

PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor will continue normal working activities throughout the project limits. During this work, temporary lane closures are possible, and flaggers will be present. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway.
[Rogers Group, Inc./Cookeville/CNV284]

PUTNAM COUNTY SR-136 [2.27-4.15] from I-40 Eastbound Ramps to SR-24 resurfacing: The contractor will be continuing nightly lane closures beginning at 7 PM until 6 AM. During this work, the contractor will have one lane closed in each direction, and flaggers will be present at side road intersections to control traffic. Motorists should be prepared to stop and should be aware of construction equipment adjacent to the roadway.
[Vulcan Construction Materials, LLC/Cookeville/CNZ293]

PUTNAM COUNTY SR-290 [0-1.57] from Jackson County Line to near Shipley School Road resurfacing and bridge repair: The contractor will be on site intermittently to perform punch list work. Lane closures may be used, and flaggers and temporary traffic control devices will be in place to facilitate the flow of traffic through the work zone. Motorists should approach the area with caution and be prepared to stop. [Rogers Group, Inc./Cookeville/262029]

REGION 2 Dynamic Message Sign (DMS) Life Cycle Replacement: No lane closures this week. There will be periodic shoulder closures at locations on I-24 East and West in Marion Co., I-24 East and West in Hamilton Co., I-75 North and South in Hamilton Co., I-75 North in Bradley Co., I-75 South in McMinn Co., SR-29 South in Hamilton Co., and SR-153 North and South in Hamilton Co. from 8 am - 5 pm. [Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]

REGION 2 On-Call Signing on Various Interstate and State Routes: The contractor will be replacing state park signs in Grundy, Sequatchie, Marion, and Franklin Counties. This work will be off the road or require shoulder closures.
[LU, Inc./Dunlap/CNZ134]

REGION 2 The on-call cable barrier repair on various Interstate and State Routes: The contractor will have shoulder closures in order to perform cable barrier rail repair. A shoulder closure will be used in the median of interstates and major divided state routes. Work will occur during daylight hours Monday through Friday as needed. [LU, Inc./McMinnville/CNZ205]

REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short-term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open on the interstate at all times, and flaggers will be present on state routes during any work performed.
[Reynolds Fence and Guardrail, Inc./McMinnville/CN26203]

REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short-term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open on the interstate at all times, and flaggers will be present on state routes during any work performed.
[Reynolds Fence and Guardrail, Inc./McMinnville/CNZ112]

REGION 2 The random on-call asphalt pothole patching on various Interstate and State Routes: The contractor will begin working Monday 7/20/2026 between 8 AM and 6 PM in Marion County on SR-28 between LM 2.5 and LM 11.5. Please be cautious of equipment entering and leaving the work zone. [Pavement Restorations, Inc./Chattanooga East/CNZ279]

REGION 2 The random on-call concrete pavement repair on various Interstate and State Routes: The contractor will perform concrete pavement repairs on I-75 NB and SB on the concrete ramps at Exit 52 in McMinn County. This work will require narrowing the ramps, leaving a 10-foot minimum width. Please use caution when using these ramps.
[Bluegrass Contracting Corporation/Dunlap/CNZ283]

REGION 2 the sweeping on various Interstate and State Routes: Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM on interstates and high-traffic state routes, while daytime sweeping can be anticipated between 9 AM and 3 PM for lower-traffic state routes.
[Spears-Hopkins Paving Co., LLC/Chattanooga West/CNZ248]

SEQUATCHIE COUNTY SR-111 [4.32-7.57] resurfacing with cold in-place recycling (CIR): The contractor will be performing resurfacing operations on SR-111 from near Lewis Chapel Road (LM 4.3) to near East Valley Road (LM 7.5) in Sequatchie County. This work will require a single-lane closure controlled by flaggers. Please use caution when driving through the work zone.
[Tinsley Asphalt, LLC/Dunlap/CN26201]

SEQUATCHIE COUNTY SR-8 (TAFT HWY.) Utility Work both directions from LM 6.75 to LM 6.93: Flagger-assisted lane closures on SR-8 (Taft Hwy.) between Walden Dr. and McCallie Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present 07/16/2026 through 07/20/2026 from 9 am - 2 pm [2026-462]

WHITE COUNTY SR-1 [0-7.7] from Van Buren County Line to SR-111 resurfacing: The contractor will be on site intermittently to perform fog sealing work on the shoulders and to work on final pavement striping and markings. The contractor is also scheduled to start bridge repairs over the Calfkiller River. During this work, one lane will be closed in each direction, and workers will be present on the roadway. Motorists are encouraged to use caution and be prepared to stop when encountering slow-moving traffic.
[Asphalt Paving Systems, Inc./Cookeville/262014]

WHITE COUNTY SR-111 [15.25-16.25] from O'Connor Rd to Old Kentucky Rd culvert replacement: The contractor will be continuing installation of a box culvert and associated work. During this work, traffic will remain in one lane each direction, and the inside lane on both sides of SR-111 will remain closed. Motorists should be aware of the reduced speed limit and follow all displayed signs. [Rogers Group, Inc./Cookeville/CNZ902]

WHITE COUNTY SR-135 [0-2.1] from SR-289 to south of SR-111 resurfacing: The contractor will continue paving operations throughout the project limits. During this work, one lane will be closed, and temporary traffic control devices and flaggers will be on site. Motorists should use caution and be prepared to stop. [Rogers Group, Inc./Cookeville/262015]

WHITE COUNTY SR-289 [0-2.61] from SR-1 to SR-111 resurfacing: The contractor will continue milling and paving operations throughout the project limits. One lane will be closed, and temporary traffic control devices and flaggers will be on site. Motorists should use caution and be prepared to stop. [Rogers Group, Inc./Cookeville/262015]

RESTRICTIONS:

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY - CNX913:

CUMBERLAND COUNTY - CNZ206: Both lanes of SR-24 are closed at LM 15.06 to LM 15.6.

###

State of Tennessee published this content on July 23, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on July 23, 2026 at 19:58 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]