California Department of Transportation

09/09/2026 | Press release | Distributed by Public on 09/09/2026 16:51

Full Weekend Closures on Northbound U.S. 101 Bayshore Freeway (Hospital Curve) September 18-21

Full Weekend Closures on Northbound U.S. 101 Bayshore Freeway (Hospital Curve) September 18-21

Published: Sep 09, 2026

Northbound Lanes Closure between Cesar Chavez St. to 17th St.

San Francisco County - Caltrans construction is closing northbound U.S. 101 Bayshore Freeway (Hospital Curve) between Cesar Chavez and 17th St. in the City of San Francisco. Starting Friday, September 18 at 11 p.m. through Monday, September 21 at 6 a.m. through Monday, September 21 at 6 a.m.

All northbound U.S. 101 lanes closed. All southbound lanes will remain open.

These closures continue the essential major pavement repair work required for long term roadway rehabilitation.

These lane closures are necessary to complete major pavement repair work as part of the ongoing Fab 4 Hospital Curve Rehabilitation Project, which began in Fall 2025. Work crews will conduct 24/7 operations during each closure weekend to ensure timely structural improvements.

Upcoming Weekend Closure Details:

October 2-4 (Third Closure)

The full highway closure will begin on Friday, October 2 at 11 p.m., when all Southbound lanes between Cesar Chavez Street and 10th Street will close. All lanes will reopen by Monday, October 4 at 6 a.m.

During this period:

  • All northbound lanes will remain open for public travel.
  • Motorists should avoid driving southbound 101 (Hospital Curve) due to anticipated delays.
  • Use I-280 as an alternate route.

October 16-18 (Fourth Closure)

The last closure weekend for Hospital Curve will take place Friday, October 16 at 11 p.m. through Monday, October 18 at 6 a.m.

The same traffic reduction configuration will apply:

  • All Southbound U.S. 101 lanes closed. All Northbound lanes will remain open.

These closures continue the essential major pavement repair work required for long term roadway rehabilitation.

Alternate Routes & Detours

Motorists are strongly encouraged to use:

  • I 280 northbound for travel toward downtown San Francisco or the San Francisco-Oakland Bay Bridge.
  • Public transportation, which remains the best option to bypass congestion and avoid work zone delays.

Detour Maps and Routes

Northbound lanes will be closed from Cesar Chavez to 17th

  1. Take NB I-280 to Bay Bridge
  2. Take SB I-280 to 19th or Monterey, off ramp to San Jose to Guerrero St.

Detour Map for Motorists Traveling to and from San Francisco Airport and Rental Car Center, the Peninsula and the South Bay

A dedicated detour map has been prepared for travelers departing from and to the San Francisco International Airport (SFO) and the SFO Rental Car Center, as well as for motorists coming from the peninsula and the South Bay who are heading toward the San Francisco-Oakland Bay Bridge and/or San Francisco destinations.

The map illustrates the preferred routing during the weekend closure.

Driver and Community Benefits

Once complete, the project will:

  • Preserve and extend the life of the freeway corridor
  • Improve ride quality and driving comfort
  • Enhance overall freeway safety

Stay Informed

For the latest updates visit sfhighwayprojects.com where Caltrans will continue to provide updates as schedules are confirmed. Motorists should check back regularly for the latest construction information, traffic impacts, and detour details.

All work is weather dependent. Please drive with caution. Thank you for your patience as we work to maintain our state's highways, bridges, and tunnels.

Caltrans appreciates the public's patience and cooperation as we work to maintain and improve California's transportation infrastructure.

For 24/7 traffic updates, please visit 511.org: https://x.com/511SFBay
For real-time information, visit Caltrans QuickMap: https://quickmap.dot.ca.gov
Follow us on X: https://x.com/CaltransD4
Or call 1-800-472-7623, 1-800-427-ROAD for state highway conditions statewide.

| CleanCA.com | CleanWaterCA | #BeWorkZoneAlert | X | Facebook | YouTube |

###

California Department of Transportation published this content on September 09, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on September 09, 2026 at 22:51 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]