06/09/2026 | Press release | Distributed by Public on 06/09/2026 06:48
The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental document that will discuss the environmental impacts of the Algonquin Reliable Affordable Resilient Enhancement Project involving construction and operation of facilities by Algonquin Gas Transmission, LLC (AGT) in: Middlesex County, Connecticut; Worcester and Norfolk Counties, Massachusetts; and Newport and Providence Counties, Rhode Island. The Commission will use this environmental document in its decision-making process to determine whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. This gathering of public input is referred to as "scoping." The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission's NEPA process is described below in the NEPA Process and Environmental Document section of this notice.
By this notice, the Commission requests public comments on the scope of issues to address in the environmental document. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on July 6, 2026. Comments may be submitted in written or oral form. Further details on how to submit comments are provided in the Public Participation section of this notice.
Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the environmental document. Commission staff will consider all written and oral comments during the preparation of the environmental document.
If you submitted comments on this project to the Commission before the opening of this docket on February 24, 2026, you will need to file those comments in Docket No. PF26-7-000 to ensure they are considered as part of this proceeding.
This notice is being sent to the Commission's current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the project, the Natural Gas Act conveys the right of eminent domain to the company. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. The Commission does not subsequently grant, exercise, or oversee the exercise of that eminent domain authority. The courts have exclusive authority to handle eminent domain cases; the Commission has no jurisdiction over these matters.
A fact sheet prepared by the FERC entitled "An Interstate Natural Gas Facility On My Land? What Do I Need To Know?" which addresses typically asked questions, including the use of eminent domain and how to participate in the Commission's proceedings. This fact sheet along with other landowner topics of interest are available for viewing on the FERC website ( www.ferc.gov ) under the Natural Gas, Landowner Topics link.
There are four methods you can use to submit your comments to the Commission. Please carefully follow these instructions so that your comments are properly recorded. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208-3676 or [email protected].
(1) You can file your comments electronically using the eComment feature, which is located on the Commission's website ( www.ferc.gov ) under the link to FERC Online. Using eComment is an easy method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling feature, which is located on the Commission's website ( www.ferc.gov ) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on "eRegister." You will be asked to select the type of filing you are making; a comment on a particular project is considered a "Comment on a Filing"; or
(3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (PF26-7-000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852.
(4) In lieu of sending written comments, the Commission invites you to attend one of the public scoping sessions its staff will conduct in the project area, scheduled as follows:
| Date and time | Location |
| Tuesday, June 16, 2026 5:30-7:30 p.m | Jesse M. Smith Memorial Library, 100 Tinkham Lane, Harrisville, RI 02830, (401) 710-7800. |
| Wednesday, June 17, 2026 5:30-7:30 p.m | The Lodge at Diamond Hill, 4097 Diamond Hill Road, Cumberland, RI 02864, (401) 799-7372. |
| Thursday, June 18, 2026 5:30-7:30 p.m | Little Compton Community Center, 34 Commons, Little Compton, RI 02837, (401) 635-2400. |
The primary goal of these scoping sessions is to have you identify the specific environmental issues and concerns that should be considered in the environmental document. Individual oral comments will be taken on a one-on-one basis with a court reporter. This format is designed to receive the maximum amount of oral comments in a convenient way during the timeframe allotted.
Each scoping session is scheduled from 5:30 p.m. to 7:30 p.m. EDT. You may arrive at any time after 5:30 p.m. There will not be a formal presentation by Commission staff when the session opens. If you wish to speak, the Commission staff will hand out numbers in the order of your arrival. Comments will be taken until 7:30 p.m. However, if no additional numbers have been handed out and all individuals who wish to provide comments have had an opportunity to do so, staff may conclude the session at 7:00 p.m. Please see appendix 1 for additional information on the session format and conduct. (1)
Your oral comments will be recorded by a court reporter (with FERC staff or representative present) and become part of the public record for this proceeding. Transcripts will be publicly available on FERC's eLibrary system (see the last page of this notice for instructions on using eLibrary). If a significant number of people are interested in providing oral comments in the one-on-one settings, a time limit of 5 minutes may be implemented for each commentor.
It is important to note that the Commission provides equal consideration to all comments received, whether filed in written form or provided orally at a scoping session. Although there will not be a formal presentation, Commission staff will be available throughout the scoping session to answer your questions about the environmental review process. Representatives from AGT may also be present to answer project-specific questions.
Additionally, the Commission offers a free service called eSubscription, which makes it easy to stay informed of all issuances and submittals regarding the dockets/projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or [email protected].
AGT plans to install a total of 13.5 miles of interstate, natural gas transmission pipeline along its existing natural gas pipeline transmission system in Rhode Island and Massachusetts. Specifically, AGT plans to replace about 8.3 miles of existing 16-inch-diameter natural gas transmission pipeline (G-1 Pipeline) with new 36-inch-diameter pipeline in Worcester and Norfolk Counties, Massachusetts, and Providence County, Rhode Island. Generally, the existing pipeline would be removed and the new pipeline would be installed in the same location. AGT also plans to install about 2.2 miles of 12-inch-diameter natural gas transmission pipeline next to its existing 6-inch-diameter pipeline (G-2 Pipeline) in Newport County, Rhode Island; and install about 3.0 miles of 36-inch-diameter pipeline loop (L36D Pipeline) next to its existing 24-inch-diameter Mainline and 30-inch-diameter L30B pipeline in Providence County, Rhode Island. The Project would also include installation of pipeline appurtenances in Massachusetts and Rhode Island and software modifications at Algonquin's existing Cromwell Compressor Station in Middlesex County, Connecticut.
The Algonquin Reliable Affordable Resilient Enhancement Project would provide about 73,500 dekatherms of natural gas per day to seven local distribution companies. According to AGT, its project would help alleviate pipeline constraints by increasing peak-day natural gas deliveries into the region and reducing reliance on non-firm or intermittent supply during high-demand events.
The general location of the project facilities is shown in appendix 2. (2)
Construction of the planned facilities would disturb a total of about 170.7 acres of land. Following construction, AGT would maintain about 103.5 acres for permanent operation of the project's facilities; the remaining acreage would be restored and revert to former uses. Approximately 100 percent of the proposed pipeline route parallels existing pipeline, utility, or road rights-of-way.
Any environmental document issued by the Commission will discuss impacts that could occur as a result of the construction and operation of the proposed project under the relevant general resource areas:
Commission staff have already identified several issues that deserve attention based on a preliminary review of the proposed facilities and the environmental information provided by AGT. This preliminary list of issues may change based on your comments and our analysis:
Commission staff will also evaluate reasonable alternatives to the proposed project or portions of the project and make recommendations on how to lessen or avoid impacts on the various resource areas. Your comments will help Commission staff identify and focus on the issues that might have an effect on the human environment and potentially eliminate others from further study and discussion in the environmental document.
Although no formal application has been filed, Commission staff have already initiated a NEPA review under the Commission's pre-filing process. The purpose of the pre-filing process is to encourage early involvement of interested stakeholders and to identify and resolve issues before the Commission receives an application. As part of the pre-filing review, Commission staff will contact federal and state agencies to discuss their involvement in the scoping process and the preparation of the environmental document.
If a formal application is filed, Commission staff will then determine whether to prepare an Environmental Assessment (EA) or an Environmental Impact Statement (EIS). The EA or the EIS will present Commission staff's independent analysis of the environmental issues. If Commission staff prepares an EA, a Notice of Schedule for the Preparation of an Environmental Assessment will be issued. The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its determination on the proposed project. If Commission staff prepares an EIS, a Notice of Intent to Prepare an EIS/Notice of Schedule will be issued once an application is filed, which will open an additional public comment period. Staff will then prepare a draft EIS that will be issued for public comment. Commission staff will consider all timely comments received during the comment period on the draft EIS, and revise the document, as necessary, before issuing a final EIS. Any EA or draft and final EIS will be available in electronic format in the public record through eLibrary (3) and the Commission's natural gas environmental documents web page ( https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents ). If eSubscribed, you will receive instant email notification when the environmental document is issued.
With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the environmental document. (4) Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice.
In accordance with the Advisory Council on Historic Preservation's implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office(s), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project's potential effects on historic properties. (5) The environmental document for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106.
The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; Native American Tribes; environmental and public interest groups; other interested parties including the Little Compton Conservation Committee, Sakonnet Preservation, Rhode Island Land Trusts; and local libraries and media outlets. This list also includes all affected landowners (as defined in the Commission's regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project and includes a mailing address with their comments. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project.
If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please complete one of the following steps:
(1) Send an email to [email protected] stating your request. You must include the docket number PF26-7-000 in your request. If you are requesting a change to your address, please be sure to include your name and the correct address. If you are requesting to delete your address from the mailing list, please include your name and address as it appeared on this notice. This email address is unable to accept comments.
OR
(2) Return the attached "Mailing List Update Form" (appendix 2).
Once AGT files its application with the Commission, you may want to become an "intervenor" which is an official party to the Commission's proceeding. Only intervenors have the right to seek rehearing of the Commission's decision and be heard by the courts if they choose to appeal the Commission's final ruling. An intervenor formally participates in the proceeding by filing a request to intervene pursuant to Rule 214 of the Commission's Rules of Practice and Procedures (18 CFR 385.214). Motions to intervene are more fully described at https://www.ferc.gov/how-intervene. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until the Commission receives a formal application for the project, after which the Commission will issue a public notice that establishes an intervention deadline.
Additional information about the project is available from the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on "General Search" and enter the docket number in the "Docket Number" field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at [email protected] or (866) 208-3676, or for TTY, contact (202) 502-8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's calendar located at https://www.ferc.gov/news-events/events along with other related information.
(Authority: 18 CFR 2.1)
(1) The appendices referenced in this notice will not appear in the Federal Register . Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called "eLibrary." For instructions on connecting to eLibrary, refer to the last page of this notice. For assistance, contact FERC at [email protected] or call toll free, (886) 208-3676 or TTY (202) 502-8659.
(2) The appendices referenced in this notice will not appear in the Federal Register . Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called "eLibrary." For instructions on connecting to eLibrary, refer to the last page of this notice. For assistance, contact FERC at [email protected] or call toll free, (886) 208-3676 or TTY (202) 502-8659.
(3) For instructions on connecting to eLibrary, refer to the last page of this notice.
(4) Cooperating agency responsibilities are addressed in Section 107(a)(3) of NEPA (42 U.S.C. 4336(a)(3)).
(5) The Advisory Council on Historic Preservation's regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places.