California Department of Transportation

11/18/2026 | Press release | Distributed by Public on 11/18/2026 14:21

Weekend Closure: Update - U.S. 101 Connector from Northbound U.S. 101 to Central Freeway

Weekend Closure: Update - U.S. 101 Connector from Northbound U.S. 101 to Central Freeway

Published: Nov 18, 2026

Friday, November 20, at 11 p.m. to Monday, November 23, 6 a.m.

San Francisco County - Caltrans is scheduling a full weekend closure of the freeway connector ramp from northbound U.S 101 to northbound US-101 Central Freeway beginning Friday, November 20, 11 p.m. to Monday, November 23, at 6:00 AM.

The full weekend closure is necessary for work crews to make critical joint repairs to the freeway/connector ramp viaduct. All lanes of the connector ramp will be closed while the work is in progress. During the closure, motorists should expect significant traffic delays and are encouraged to use the alternate routes listed below. These repairs are part of the Central/Bayshore Freeway Viaduct Project and represent one phase of the larger Fab 4 Rehabilitation Program, an effort to revitalize and improve San Francisco's freeway infrastructure and roadway network.

Read more about Fab 4 projects at www.sfhighwayprojects.com.

Weekend Closure Details:

  • The northbound US-101 connector ramp will be closed to all traffic Friday November 20, 11:00 p.m. to Monday to November 23, 6: 00 a.m.
  • Motorists will not have access to the northbound US-101 connector.
  • US-101 connector will re-open at 6 a.m., Monday November 23.
  • Detour at 7th St. offramp.
  • Motorists may experience significant traffic delays.

Detour: Motorists traveling northbound US-101 from San Jose:

  • Take eastbound I-80 to 7th St. offramp.
  • Turn left of 7th St. and travel under the freeway.
  • Turn left on 7th St. onramp.

Why This Work Is Necessary

The Central and Bayshore freeway viaducts are 71 years old and carry thousands of vehicles daily near the San Francisco-Oakland Bay Bridge corridor. With constant exposure to heavy traffic loads, weather, and seismic demands, the structures require timely rehabilitation to prevent further deterioration. Performing this work now allows Caltrans to address critical maintenance needs, preserve the existing infrastructure, and ensure continued safety for motorists, commuters, pedestrians, and cyclists traveling through and beneath the structures.

Driver and Community Benefits

Once complete, the project will:

  • Preserve and extend the life of the viaduct structures
  • Improve ride quality and driving comfort
  • Enhance overall freeway safety
  • Provide safer conditions for pedestrians and cyclists traveling near and beneath the viaducts

Stay Informed For the latest updates visit sfhighwayprojects.com where Caltrans will continue to provide updates as schedules are confirmed. Motorists should check back regularly for the latest construction information, traffic impacts, and detour details.

All work is weather dependent. Please drive with caution. Thank you for your patience as we work to maintain our state's highways, bridges, and tunnels.

For real-time traffic, click on Caltrans QuickMap: https://quickmap.dot.ca.gov/

Caltrans appreciates the public's patience and cooperation as we work to maintain and improve California's transportation infrastructure.

For 24/7 traffic updates, please visit 511.org: https://x.com/511SFBay
For real-time information, visit Caltrans QuickMap: https://quickmap.dot.ca.gov
Follow us on X: https://x.com/CaltransD4
Or call 1-800-472-7623, 1-800-427-ROAD for state highway conditions statewide.

| CleanCA.com | CleanWaterCA | #BeWorkZoneAlert | X | Facebook | YouTube |

###

California Department of Transportation published this content on November 18, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 18, 2026 at 20:22 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]