North Millsboro Bypass Opening
Millsboro - ; The Delaware Department of Transportation (DelDOT) announces that the new North Millsboro Bypass will open Friday, September 26, 2025.
With the opening of the bypass, motorists should be aware of the following permanent roadway changes:
- The intersection of Jersey Road at SR 24 and Hollyville Road will be permanently closed.
- Jersey Road will be converted to a cul-de-sac at this location.
- The intersection and connecting portions of SR 24 and Hollyville Road will be removed.
- The section of Betts Pond Road between Fox Run Road and US 113 will reopen in its new configuration. There will no longer be direct access to US 113 from Betts Pond Road, as it will end in a cul-de-sac. A new ramp from Betts Pond Road will connect to the bypass at a signalized intersection. From this point, motorists can:
- Head across the bypass to access US 113 northbound
- Turn left to access SR 20 and the ramp to US 113 southbound
- Turn right onto the new bypass to SR 24 eastbound
The bypass is designed to improve traffic flow and safety by redirecting through-traffic away from local roads. Drivers are encouraged to use the new roadway and remain alert as traffic patterns adjust.