Norwegian Ocean Industry Authority

11/20/2026 | Press release | Distributed by Public on 11/20/2026 08:13

ConocoPhillips - load-bearing structures

The audit was conducted from 19 to 20 October 2026.

Objective

The objective of the audit was to obtain an overview of the condition of COPSAS's facilities, and to clarify whether they are being followed up in compliance with the HSE regulations.

Result

One nonconformity was identified relating to design loads and collision resistance for bridges that could be struck by visiting vessels.

What happens next?

We have asked ConocoPhillips to report to us on how the non-conformity will be addressed. The reply deadline is set to 11 December 2026.

Norwegian Ocean Industry Authority published this content on November 20, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 20, 2026 at 14:14 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]