City Projects
32nd Street, Avenue 3E to Arizona Avenue
A contractor for the City is landscaping the center medians along 32nd Street between Avenue 3E and Arizona Avenue. Work will take place in several phases. Currently there is a single lane closure in the Eastbound and Westbound directions on 32nd Street between Avenue 3E and Pacific Avenue.
Arizona Avenue, 17th Street to 24th Street
A contractor working for the City is replacing the water line on Arizona Avenue between 17th Street and 24th Street. Work will take place in several phases. Currently, Southbound Arizona Avenue is closed between 17th Street and 20th Street.
Avenue 5E, 36th Street to 30th Place
A contractor working for the City is installing a sanitary sewer line on Avenue 5E between 36th Street and 30th Place, Work will take place in several phases. Currently, Avenue 5E is closed between 32nd Street and 30th Place.
28th Street and Avenue C
A contractor working for the City will reconstruct the intersection of Avenue C and 28th Street, resulting in a full closure of that intersection. The work will continue with road closures on 28th Street through January 2026 between Avenue C and 45th Avenue, as well as between Avenue C and 33rd Drive.
Edenwood Estates pavement replacement
Beginning mid-August, a contractor working for the City will replace the pavement in the Edenwood Estates subdivision, which is southwest of 25th Street and Avenue B. The first phase of work will be the closure of Edgewood Drive from 25th Street through its south-end cul-de-sac, followed by single-block closures of Elmwood Drive, Fernwood Drive, Parkwood Drive, 26th Drive, 25th Place Greenwood Avenue, Olivewood Lane, Pinewood Lane, Oakwood Lane, and 27th Avenue from 24th Street to 25th Street. Estimated completion is in late December.
City Street Maintenance
City Street Maintenance operations for the week of November 10 - 16 will take place in the following areas.
Street Asphalt Patching:
Sanguinetti Manors, units 1 and 2.
Concrete Sidewalk Repair:
4th Avenue from 1st Street to 2nd Street.
1st Avenue from 8th Street to 9th Street.
Avenue A from 11th Street to 12th Street.
Streets Crack Seal Repairs:
Ocotillo 4B.
Avenue 6E from 46th Street to 48th Street.
Slurry Seal Operations
November 10:
Kings Lane from 4th Avenue to Kings Court.
30th Place from Barkley Ranch Avenue to 47th Avenue.
47th Avenue from 30th Place to Rodeo Drive.
Maiden Lane from 1st Street to 2nd Street.
Gila Street from Giss Parkway to 6th Street.
November 11:
16th Street from 44th Avenue to west end cul-de-sac.
16th Street from 44th Avenue to east end cul-de-sac.
44th Avenue from 16th Street to 15th Place.
14th Place from 37th Drive to 35th Drive.
15th Street from 33rd Drive to 35th Drive.
35th Avenue from 15th Street to 14th Street.
36th Drive from 14th Lane to 15th Lane.
30th Street from 48th Way to 47th Drive.
47th Drive from 30th Street to 30th Lane.
November 12:
15th Place from 44th Avenue to east end cul-de-sac.
15th Place from 44th Avenue to west end cul-de-sac.
44th Avenue from 15th Place to 15th Street.
13th Street from 42nd Drive to 41st Drive.
42nd Avenue from 13th Street to north end cul-de-sac.
41st Drive from 13th Street to north end cul-de-sac.
15th Lane from 37th Avenue to 34th Avenue.
15th Place from 35th Drive to 33rd Drive.
34th Avenue from 15th Place to 15th Lane.
31st Place from 48th Way to 47th Drive.
47th Drive from 31st Place to 30th Lane.
November 13:
13th Place from 42nd Drive to 41st Avenue.
42nd Avenue from 13th Place to south end cul-de-sac.
41st Drive from 13th Place to south end cul-de-sac.
12th Place from Avenue C to 40th Drive.
40th Drive from 13th Street to north end cul-de-sac.
41th Avenue from 13th Street to north end cul-de-sac.
13th Street from 40th Drive to 41st Drive.
37th Avenue from 16th Street to 14th Lane.
15th Street from 37th Avenue to west end cul-de-sac.
33rd Drive from 16th Street to 14th Street.
November 14:
44th Avenue from 15th Street to 14th Place.
15th Street from 44th Avenue to west end cul-de-sac.
14th Lane from 43rd Avenue to west end cul-de-sac.
40th Drive from 14th Street to 13th Place.
13th Place from 40th Drive to 41st Drive.
41st Avenue from 13th Place to south end cul-de-sac.
37th Drive from 14th Lane to 14th Street.
14th Lane from 35th Drive to 37th Drive.
14th Street from 35th Avenue to 33rd Drive.
November 16:
11th Street from 1st Avenue to 2nd Avenue.
11th Street from 3rd Avenue to 4th Avenue.
12th Street from 3rd Avenue to 4th Avenue.
27th Drive from 1st Street to north end cul-de-sac.
Yowell Court from Avenue B to east end cul-de-sac.
Road closure at 32nd Street and Avenue C.
Other utility projects and encroachment permits
Smucker Park Basin project: Avenue A, Parkview to Westridge (Yuma County)
A contractor working for Yuma County is working on the Smucker Park flood control basin, which will at times affect Avenue A between Parkview Loop and 28th Street. The sidewalk on the west side of Avenue A is closed. Motorists on Avenue A should be aware of trucks entering and exiting the roadway on the north side of the park. Phases of work will include lane restrictions on Avenue A and a closure at Westridge. Message boards will be activated 72 hours prior to any such closure.
Maiden Lane, 1st Street to 2nd Street (Yuma County)
Maiden Lane from 1st Street to 2nd Street is closed to through traffic for continued work on a new building for Yuma County through late November.
Fiber optic installations (Allo)
Communications line installations are taking place in areas designated for utility easements in numerous and various locations within the City limits and surrounding vicinity. Motorists are advised to watch for work zones in unexpected areas.
Avenue 3E, 32nd Street (CenturyLink)
Beginning August 7, CenturyLink crews will be accessing a manhole at the intersection of Avenue 3E and 32nd Street. Work will require lane restrictions. Drivers are advised to follow traffic control. Work is anticipated to be completed by mid-December.
24th Street, Carol Avenue to Mary Avenue (CenturyLink)
Through November 21, CenturyLink crews will be accessing a manhole at the intersection of Avenue 3E and 32nd Street. Work will require lane restrictions. Drivers are advised to follow traffic control.
Avenue 4E, 38th Street to 40th Street (private contractor)
Starting September 8, contractor will be installing water line along Avenue 4E between 38th Street and 40th Street. Work will prompt a road closure, and drivers are advised to follow traffic control. Work is anticipated to be completed by late October.
Avenue B, 32nd Street (Yuma County Water Users Association)
Through late October, Yuma County Water Users Association crews will be doing maintenance work on existing irrigation box at the intersection of Avenue B and 32nd Street. Work will prompt lane shifts.
Avenue B, 8th Street (APS)
Starting October 15, APS crews will be removing existing overhead facilities in conflict with new development along Avenue B and 8th Street. Work will prompt lane restrictions and a reduced speed limit of 25 mph. Project is anticipated to be completed by late November.
4th Avenue, 32nd Street (CenturyLink)
Beginning November 7, CenturyLink crews will be accessing a manhole at the intersection of 4th Avenue and 32nd Street. Work will require lane restrictions. Drivers are advised to follow traffic control. Work is anticipated to be completed by late November.
24th Street, 8th Avenue (Pilkington Construction)
October 27-31, contractor will be connecting a main water line along 8th Avenue and 24th Street. Work will prompt a road closure, and drivers are advised to follow detour traffic control.
END