Connecticut Department of Transportation

03/30/2026 | Press release | Distributed by Public on 03/30/2026 14:56

Bridge Work Between Exits 11 and 12A on Route 8 in Shelton

Bridge Work Between Exits 11 and 12A on Route 8 in Shelton

3/30/2026

The Connecticut Department of Transportation (CTDOT) is announcing bridge work will be performed on Route 8 in Shelton between Exits 11 and 12 A (Bridge # 569). This project is scheduled to occur on Monday, April 6 and be completed on Friday, April 24, 2026. This project ensures the bridge remains in a state of good repair.

This project is being performed by Hammonasset Construction LLC.

LANE CLOSURE/DETOUR INFO

There will be various lane closures on Route 8 from Monday, April 6 to Friday, April 24, 2026 from 8:00 a.m. to 4:00 p.m. Traffic control signing patterns, and crash units will guide motorists through the work zone.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.

Media Contact:
860-594-2560
[email protected]
Operating Hours: Monday - Friday 8:00 a.m. to 4:30 p.m.
Connecticut Department of Transportation published this content on March 30, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on March 30, 2026 at 20:56 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]