City of Santa Ana, CA

04/28/2026 | Press release | Distributed by Public on 04/28/2026 13:00

Traffic flow on section of Flower Street to be reduced to one lane in each direction April 29 to May 15

Concrete is being replaced on Flower Street, from First Street to Washington Avenue, from April 29 through May 15.

As a result, traffic flow will be restricted to one lane in each direction.

Please note that there may be delays for both motorists and pedestrians, and keep an eye out for advisory signs.

City of Santa Ana, CA published this content on April 28, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on April 28, 2026 at 19:00 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]