07/02/2026 | Press release | Distributed by Public on 07/02/2026 14:53
City Projects
Avenue 5E, 32nd Street to 30th Place
Starting July 6, crews will begin water line repair work on Avenue 5E between 32nd Street and 30th Place. Avenue 5E will be closed in the area during the work. Drivers are advised to follow posted traffic control signs in the area. Work is expected to be completed by mid-July.
32nd Street, Catalina Drive to Arizona Avenue
Beginning June 29 crews working with the City will perform sewer manhole rehabilitation on 32nd Street between Catalina Drive and Arizona Avenue. Work will require a right-lane closure. Drivers are advised to keep left, follow all traffic control signs and drive with caution through the work zone. Work is expected to be completed early July.
Avenue C, 20thStreet to 24th Street
Beginning June 15, an ADOT contractor will install ADA ramps and a HAWK pedestrian beacon on Avenue C and the Central Drain Pathway. Sidewalks on the north and south sides of the Central Drain will be closed during the project. Intermittent partial lane closures will take place on Avenue C between 20th Street and 24th Street. Motorists are encouraged to follow all traffic control signs and drive safely through the work zone. Work is expected to be completed in August.
Redondo Avenue, Giss Parkway to Interstate 8 eastbound ramps
Starting June 8, a private contractor working with the City will install a water distribution line from 5th Street and Gila Street to Redondo Center Drive. Work will require closure of Redondo Center Drive between Giss Parkway and the Interstate 8 eastbound ramps. Drivers are advised to follow posted traffic control signs and detour signage in the area. Work is expected to be completed by early July.
Mesquite Avenue, Catalina Drive to Arizona Avenue
Beginning May 11, Mesquite Avenue will be closed for waterline and pavement replacement between Catalina Drive and Arizona Avenue. Work will also require closures on Catalina Drive, Coronado Avenue, Palmaire Avenue, Del Mar Avenue, and 30th Street, along with partial closures on Arizona Avenue. Drivers are advised to follow posted traffic control signs in the area.
City Street Maintenance
City Street Maintenance operations for the week of July 6 - July 10 will take place in the following areas.
Street Asphalt Patching:
La Mesa Park Subdivision 2 and 4.
Avenue 6E, 32nd Street to 40th Street.
Asphalt Crack Seal:
24th Street, Araby Road to Avenue 9E.
Pacific Avenue, 32nd Street to 24th Street.
Vista del Sol Subdivision.
Engler Estates.
Concrete Sidewalk Repair:
800 Block of 5th Avenue.
Tamarack Subdivision 4.
Ocotillo Subdivision 1.
Crosswalk Thermoplastic:
21st Drive, 32nd Street to 28th Street.
Alley Maintenance:
Colorado Street to West Main Canal, Avenue B to 20th Avenue.
Other utility projects and encroachment permits
Avenue C, 37th Avenue to 33rd Drive (CPE Construction)
Starting July 6, crews with CPE Construction will install a raised traffic island on Avenue C near 37th Avenue. Work will require closures of the inside westbound and eastbound lanes on Avenue C between 37th Avenue and 33rd Drive. Work is expected to be completed by mid-July.
24th Street and Avenue B (Yuma County Public Works)
Starting June 29, crews with Yuma County Public Works will complete sidewalk repairs in the 2400 block of Avenue B. Work will require closure of the eastbound outside lane. Drivers are advised to follow posted traffic control signs in the area. Work is expected to be completed by early July.
8th Avenue, 24th Street to 25th Street (Private Contractor)
Starting June 22, crews will widen the outside southbound lane on 8th Avenue between 24th Street and 25th Street. Work will require closure of the outside southbound lane during construction. Work is expected to be completed by mid-July.
28th Street, Avenue 4E to Shari Avenue (DPE Construction)
Crews will complete street improvements on 28th Street between Avenue 4E and Shari Avenue, including sewer and water line work, new concrete, asphalt, and striping. Work will require closure of 28th Street in this area. Work is expected to be completed by late July.
20th Avenue, 8th Street to 6th Place (Southwest Gas Corp.)
Beginning April 14, crews with Southwest Gas Corp. will complete gas line replacement work on 20th Avenue between 8th Street and 6th Place. Work will require a road closure on 20th Avenue in that area, as well as closures on 7th Street at 19th Avenue and 21st Avenue. Drivers are advised to follow posted traffic control signs in the area. Work is expected to be completed by late July.
Routine Maintenance, Tree Trimming, and Survey Work (APS)
APS crews will be conducting routine maintenance, tree trimming, and survey work throughout the year in various locations within the City. Motorists are advised to watch for work zones in unexpected areas and follow all posted traffic control.
Fiber optic installations (Allo)
Communications line installations are taking place in areas designated for utility easements in numerous and various locations within the City limits and surrounding vicinity. Motorists are advised to watch for work zones in unexpected areas.