Ascendia Pharmaceuticals Inc.

11/25/2026 | Press release | Distributed by Public on 11/25/2026 15:07

Five Factors When Selecting a CDMO for Clinical Trial Manufacturing

Clinical trial manufacturing involving controlled substances requires more than a compliant formulation and qualified production team. Pharmaceutical and biotechnology companies need a contract development and manufacturing organization (CDMO) with systems capable of protecting and accounting for controlled materials as they move through the drug development pipeline and to market.

For Schedule II substances, compliance tends to be rigorous. DEA requirements must operate alongside current good manufacturing practice (cGMP), quality systems, data-integrity controls, and clinical drug accountability procedures. Controlled substances add another layer of complexity to an already highly regulated clinical manufacturing environment.

In the United States, DEA registrants are required to provide effective controls and procedures to guard against theft and diversion. Under 21 CFR 1301.71, the adequacy of those controls is evaluated based on multiple factors.

These requirements operate alongside FDA expectations for manufacturing investigational drugs. FDA guidance emphasizes quality-control systems, appropriate facilities and equipment, controlled materials, manufacturing records, laboratory controls, packaging and labeling, and recordkeeping. The result is an environment in which security, manufacturing quality, and documentation operate as an integrated system.

That makes CDMO selection particularly important. Sponsors should evaluate more than formulation and manufacturing capabilities. Here are five other factors to make sure you are partnering with the best CDMO for your project.

1. Establish a Documented Chain of Custody

Chain of custody documents listing who possessed a controlled substance, its location, amount transferred, and reason for each transfer must be prepared. In CTM, that chain begins prior to receipt by the CDMO and often continues through manufacturing, packaging, and delivery of clinical supplies. A robust process should cover material authorization, receipt and verification, secure storage, internal transfers, shipment, returns, and final destruction.

This is where an integrated development and manufacturing model can provide an operational advantage. Ascendia Pharmaceutical Solutions brings formulation development, analytical testing, and cGMP clinical manufacturing together under one roof within its CDMO operation.

Our clinical trial manufacturing capabilities support Phase I, II and III programs and include analytical testing, raw-material characterization and sourcing, formulation development, and manufacturing. Keeping more of these activities within an integrated operation can reduce transfers between unrelated vendors and create fewer handoffs at which controlled materials need to be received, documented, and reconciled.

For controlled-substance projects, that continuity can simplify the establishment of a traceable material history. Controlled API and finished drug products can move through receipt, storage, formulation, analytical testing and clinical manufacturing under coordinated procedures rather than through a fragmented network of service providers.

2. Use Layered Security and Diversion Controls

Physical security is essential when handling controlled substances, but it can't depend on a single lock, vault, or access-control technology. Effective diversion prevention combines facility design, personnel controls, operating procedures, technology, and oversight.

Depending on the substance, quantity and activity, controls can include restricted-access storage rooms, vaults, safes or other secure enclosures; electronic badge, PIN or biometric access; alarm and intrusion-detection systems; video monitoring; visitor controls; key and combination management; segregation of controlled substances; personnel qualification and training; separation of duties; physical inventory counts; and formal investigation of unexplained variances.

The principle of least privilege is recommended. Employee access to the materials and areas is based on their responsibilities. Privileges are periodically reviewed and changed, as necessary.

Facility design also matters. Ascendia operates a 60,000-square-foot North Brunswick, New Jersey facility that includes approximately 17,000 square feet of cGMP manufacturing and warehouse space and ISO 5, ISO 7 and ISO 8 processing and filling environments. We have established layers of security to ensure safety throughout the facility using current technology and complementary procedures.

These purpose-designed environments provide the physical and procedural foundation upon which project-specific controlled-material safeguards can be implemented. For a controlled-substance project, sponsors should independently verify that the facility, schedule, quantities, and proposed activities fall within all applicable DEA and state registrations and authorizations.

Diversion prevention also needs to account for less obvious pathways. Sampling, analytical testing, spills, line losses, rejected material, material retained in processing equipment and cleaning waste can all affect controlled-substance accountability. For these reasons, the Ascendia team establishes a defined accounting and disposition process with every project.

3. Integrate DEA Compliance into the cGMP Quality System

Controlled-substance compliance should not operate as a separate administrative process disconnected from pharmaceutical manufacturing. An effective program integrates DEA requirements into the CDMO's broader quality management system.

Procedures should address receipt and verification, storage, access authorization, weighing and dispensing, manufacturing, sampling and analytical testing, packaging and labeling, inventory reconciliation, waste handling and destruction, shipment and returns. Systems also need to address deviations, investigations, corrective and preventive actions (CAPAs), training, and escalation of suspected theft or significant loss. That approach complements FDA expectations for clinical manufacturing.

Ascendia's broad clinical trial manufacturing model illustrates how quality activities can be connected. Its clinical manufacturing operation combines formulation development with analytical method development, quality-control testing, stability capabilities and cGMP manufacturing. Another benefit is that all these services are provided in a single U.S. location to limit shipments and other logistics that can lower quality.

Integrating analytical and manufacturing activities can be especially valuable for controlled-substance programs because testing itself consumes material. Samples removed for identity, potency, stability or other analytical work need to be incorporated into material accountability rather than treated as separate from manufacturing inventory.

Manufacturers must also maintain complete and accurate controlled-substance records. Schedule II records and inventories must be maintained and readily retrievable in accordance with applicable DEA requirements. Sponsors should establish how the CDMO manages federal requirements as well as applicable state requirements, which can vary according to jurisdiction, activity, substance and registration status.

4. Build Traceability into Batch Records

A controlled-substance batch record needs to do more than demonstrate that manufacturing instructions were followed. The CDMO and sponsor should use it to reconstruct the movement of material and establish a defensible mass balance. Batch records also need to connect incoming API or drug-substance lots.

FDA guidance for APIs used in clinical trials emphasizes appropriate GMP concepts and documentation. Production should be recorded in batch records, laboratory notebooks or other appropriate systems. The need for traceability becomes even more important when a CDMO supports multiple dosage forms and development stages.

As a controlled-substance candidate progresses from a small early-stage batch toward larger clinical studies, the material-accountability system must scale with manufacturing. Traceability cannot be lost because the process becomes larger or more complex.

Ascendia has a track record of scaling accordingly. For example, when electronic batch records, inventory platforms, barcode systems or electronic access controls are used, the integrity of the records are supported by validated systems, audit trails, user permissions, backup procedures and data review.

5. Reconcile Inventory at Every Critical Transition

At any point in the process, the CDMO should be able to explain the relationship between the amount of controlled substance received, as well as how much was used and remains. The appropriate level of detail depends on the substance and operation, but reconciliation should occur at defined control points. Ascendia conducts reconciliation at receipt, dispensing, completion of manufacturing, packaging, shipment, return, destruction, and periodic inventory reviews.

Integration of formulation, analytical testing, and manufacturing can make this process more manageable because material consumed during development and testing can be tied more directly to manufacturing accountability. Ascendia, for example, provides analytical method development and quality-control testing, in addition to formulation and clinical trial manufacturing in a single U.S. facility. For a controlled-substance program within the appropriate authorizations, coordinating these activities in one location can help establish a more complete and accurate picture of where material is being used throughout development.

Accountability is particularly important when working with limited quantities of a controlled API. Sponsors do more than guard against diversion. They have to protect valuable development material and ensure that enough is available to support analytical work, manufacturing, and clinical supply requirements.

What Sponsors Should Expect From a CDMO

Before selecting a partner for controlled-substance clinical trial manufacturing, sponsors should establish that the CDMO can manage the technical and regulatory dimensions of the program.

Here are six questions a supplier needs to ask its partner before engaging in a project.

Sponsors should also examine the quality agreement carefully. Responsibilities for manufacturing, analytical testing, batch release, deviations, recalls, shipping, returns and destruction should be clearly defined. The CDMO should provide a complete batch history and material-traceability package that supports both cGMP documentation and controlled-substance accountability.

For sponsors developing controlled-substance drug candidates, the potential benefit of this model extends beyond convenience. Every transfer can create another documentation step, reconciliation point and opportunity for delay or discrepancy. Bringing formulation development, analytical testing and clinical manufacturing together can reduce handoffs while helping maintain continuity as a program advances. The key, however, is to establish the regulatory scope at the outset.

Conclusion

Controlled-substance clinical trial manufacturing depends on disciplined execution across the entire material lifecycle. Sponsors should select a CDMO that can demonstrate an integrated system rather than isolated compliance activities.

Contact the Ascendia team to learn more about our experience in handling controlled substances.

Note: This post is for general educational. It does not constitute legal or regulatory advice. Sponsors and manufacturers should confirm current federal, state, and international requirements with qualified regulatory and legal professionals before initiating controlled-substance activities.

Ascendia Pharmaceuticals Inc. published this content on November 25, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 25, 2026 at 21:26 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]