Manitowoc Company Inc.

10/06/2026 | Press release | Distributed by Public on 10/07/2026 03:27

Potain and Grove cranes help build €30 million Italian agri-food complex

  • A Potain Evy 30-23 self-erecting crane and a Potain MDT 259 J12 topless tower crane are constructing the Mulino Caputo facility in Ripamolisani, Italy.
  • To assemble the MDT 259 J12, contractor M.B.C. used a Grove GMK5150L-1 all-terrain crane for its mobility, stability and precision.

Two Potain cranes, an Evy 30-23 self-erecting crane and an MDT 259 J12 topless tower crane, are playing a key role in the construction of a new milling facility in Ripamolisani, southern Italy. The new facility will significantly increase milling capacity and support the continued growth of Italy's agri-food sector. The €30 million project for Mulino Caputo also relied on a Grove GMK5150L-1 all-terrain crane to assemble the Potain MDT 259 J12.

The Potain Evy 30-23 was deployed during the initial phase of construction. Its compact dimensions, rapid assembly, and ease of transport enabled contractor Gruppo Mitri Costruzioni (M.B.C.) to accelerate jobsite setup and optimize available space, helping maximize jobsite productivity. With a maximum capacity of 4 t and a 30 m jib, the Evy 30-23 is ideal for projects where fast, efficient deployment and compact dimensions are critical.

As construction progressed, M.B.C. brought in the powerful Potain MDT 259 J12 topless tower. To assemble the crane, the company selected a Grove GMK5150L-1 for its high lifting performance, compact footprint, and excellent maneuverability. Featuring a 60 m main boom and maximum capacity of 150 t, the all-terrain crane provided the right combination of mobility, stability, and precision to complete the assembly.

On site, the Potain MDT 259 J12 was erected with a jib of 60 m and at a hook height of 70 m. It immediately got to work on a range of lifting duties, moving large structural components weighing up to 12 t and supporting the installation of key process equipment. The MDT 259 J12 delivers a maximum lifting capacity of 12 t and up to 65 m of jib, making it an ideal choice for demanding infrastructure, industrial, and high-rise construction projects, including those in restricted urban environments.

Manitowoc Company Inc. published this content on October 06, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on October 07, 2026 at 09:27 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]