Set forth below is a transcript of an interview of Rod Colwell, Chief Executive Officer of Controlled Thermal Resources Holdings Inc. ("CTR"), and Kanishka Roy, Chairman and Chief Executive Officer of Plum Acquisition Corp. IV ("Plum IV"), with Nick Clayton on the SPAC Insider podcast on Wednesday, November 25, 2026, in which the proposed business combination between Plum IV and CTR was discussed.
Audio File Transcript
No Offer or Solicitation
This podcast is for informational purposes only and is not a proxy statement or solicitation of a proxy, consent or authorization with respect to any securities or in respect of the Proposed Transactions and shall not constitute an offer to sell or exchange, or a solicitation of an offer to buy or exchange the securities of Plum IV or CTR, or any commodity or instrument or related derivative, nor shall there be any sale of any such securities in any state or jurisdiction in which such offer, solicitation, sale or exchange would be unlawful prior to registration or qualification under the securities laws of any such state or jurisdiction. This podcast is not, and under no circumstances is to be construed as, a prospectus, an advertisement or a public offering of the securities described herein in the United States or any other jurisdiction.
Forward-Looking Statements
This podcast contains certain forward-looking statements within the meaning of the U.S. federal securities laws with respect to the Proposed Transactions and the parties thereto. All statements contained in this podcast other than statements of historical fact are forward-looking statements. These forward-looking statements are based on the current expectations and assumptions of Plum IV and CTR and are subject to risks and uncertainties that could cause actual results to differ materially from those expressed or implied by such forward-looking statements.
Nick - Host
Hello and welcome to another SPAC Insider podcast, where we bring an independent eye into viewing the targets of SPAC transactions and other SPAC partners. Of all of the energy resources that have been tapped to meet soaring energy demand from data centers, geothermal might be both the least discussed and potentially the most economical. I'm Nick Clayton, and this week I speak with Rod Colwell, CEO of Controlled Thermal Resources, and Kanishka Roy, Chairman and CEO of Plum Acquisition Corp 4. The two announced a $3.3 billion business combination in March. Rod explains how the company plans a staged approach to develop its power generation assets in California's proven geothermal field in the Imperial Valley, and how the later stages will fold in a potentially even more valuable lithium extraction opportunity. Kanishka lays out how the Plum team has helped roadmap this financing path for Ctr. and why a SPAC deal now is time to coincide with some major milestones the company can meet in the near term as a public company. Take a listen. So Rod, Controlled Thermal Resources is developing a fascinating project over in California's Salton Sea, but there is actually a long history of economic activity there. When did you first see the opportunity for really major expansion in that area?
Rod - CTR
Yes, Nick, we originally had engineers look at Salton Sea back as early as 2010 through to actively more actively into 2013. And we come to the early decision then given the operating history of 11 power plants at that stage, which 10 of them are Berkshire Hathaway Energy and another that's operated by CERC Macquarie. There was no deprivation of resource. There's this great steady state, high capacity geothermal production that's been going on now for 45 years. So that's how we discovered it. wasn't a secret. It's just probably been off the radar. for a long time, given that they're all private companies out there. That's not something that you read about every day. So it was a great find.
Nick - Host
Similarly, Kanishka, this is the Plum team's second foray into the mining and energy space in terms of SPAC deals anyway. What attracted you to the promise here?
Kanishka - Plum
Yeah, I think in general, Nick, we've been fascinated with the sector, not just the mining sector, but the nuts and bolts of what feeds AI and AI infrastructure. The thing that really attracted us was the two-pronged sort of solution that Rod and team have created over the last decade. One, going after the energy needs for AI data centers and just energy needs in general and the fact that this was a green, renewable geothermal resource and the ability to have a high capacity sort of energy source there. And then also the fact that they were using some of the brine that's being extracted as part of the geothermal resource to then extract critical minerals like lithium and many other rare earths and other things. It just created a very compelling story for a company to serve the needs of AI data centers, both on the energy side, as well as supplying them lithium initially, that would go into best systems, battery energy storage systems that need lithium and become a one-stop shop for what we call the picks and shovels of the AI data center industry.
| 2 |
Nick - Host
Yeah, and Rod, you mentioned some of the other power plant projects that have been located in this area, and Kanishka just touched upon the potential for some lithium extraction as well. What is it that makes this area special for both geothermal power and ability to pull out lithium as well.
Rod - CTR
Yeah, I think in simple terms, it's a heavily mineralized hydrothermal system. So think of brine or water with about a close to 25% of that water being total dissolved solids in the form of minerals. So basically, the Colorado River or the Grand Canyon had to been sort of those minerals or that Grand Canyon ended up deposited there after, you know, millennia over millennia. And it's heated by the bottom end of the San Andreas faults. Yeah, incredible heat source and that's what makes it unique. So if you think about super high temperature, super critical temperatures down reasonably shallow that boil this brine and basically leach out a lot of the critical minerals and rare earths and things like that we're chasing does make it unique. So number one, it's unique in the sense of high capacity steam. The capacity factors for geothermal power in this region are run between 95 and 98%. that's actually higher than nuclear. So it's very reliable. The technology is very proven. Then of course, the minerals recovery has been going on since the late 90s with zinc recovery, lithium recovery, and all sorts of various works that's going on. So it is unique, like I guess most brines.
Nick - Host
And in this age of skyrocketing power demand from data centers, what makes geothermal an attractive electricity source for that specific application?
Rod - CTR
Well, it's interesting, you know, and great question. You know, this has evolved so quick Right. Like particularly the last 18 months we've seen, and bear with me, but we've seen the quick history of where AI hyperscalers have been. They say, look, we'll take power on the grid, we'll take power in Phoenix, we'll take power in Silicon Valley or anywhere else where the Cal ISO can touch or the Western grid can touch. And that's fine with us. We thought we can connect. But quick evolution over that last 18 months has evolved to price in grid connectivity issues and with connection, community sort of outrage. And more importantly, I think it's advanced to reliability factors. So they see geothermal as more behind the meter now, behind the meter meaning multiple generators as we're proposing at Ctr. It gives a high capacity factor, as I mentioned, of the output of these thermal plants. And then being connected to say six or seven various individual power plants is very, very attractive. So then I think as you consider Ctr. controls 4,000 acres of industrial land, that's really sort of brought the story to the behind the meter reliability, not being, you know, having to connect to a system. You see what's happened in Texas and Georgia with the sort of blue wave that's That's happened there in the sense that the grid connectivity is near impossible now. This has sort of forced the market to gain reliability. Then also we're very, very close to high capacity fiber. We have a very low ping time, being close to the San Diego and LA Asian cables. So it's just by location, quite suited. The industrial land is very well suited. Being behind the meter is also quite attractive right now.
| 3 |
Kanishka - Plum
One of the things that got us very comfortable about geothermal and really excited, when we looked at geothermal versus natural gas and nuclear and solar, wind and hydropower, solar, wind and hydropower intermittent sources, but the others are actually full base load sources. But even across criteria such as low land use usage, clean, renewable, power, low lifetime cost, deployment speed. Geothermal by far beats the others across those criteria. And I think it's going to become more and more sort of mainstream and especially because of the low lifetime cost over the next couple of decades at least.
Rod - CTR
Yeah, so Nick, another aspect that we're working on here is the CO2 abatement or the carbon credentials of this project. If you think about putting that in monetary terms, if you think that a hyperscaler will generally offset the carbon footprint by purchasing some sort of renewable, whether it's a forest or whether it's a wind farm or solar field, and they'll offset that by magnitudes of hundreds of millions of dollars, right? You see that, right? So the Hell's Kitchen project fully developed will produce less from an abatement, about 80 million metric tons compared to the same size project of a modern natural gas fired power plant. So 80 million metric tons is an enormous number and the art of all of this now an opportunity I think for both sides, whether it's hyperscalers and clean critical minerals producers is to how do we, instead of offsetting and investing their carbon footprint, How does that investment come into a project like this to advance long lead items, bring the project forward? Because everything right now is not only access to a powered site, it's actually how quick can we get online? That's the real question here. So there's some art here that's unique, but nevertheless, I think there are also fundamental opportunities that we can take advantage of.
Nick - Host
And what really plays into that low lifetime cost? You lay out some of the steps and permitting that you're going through here, and we can get into those, but just, when it comes to geothermal, what is some of the differences there that really make some of the economics attractive?
Rod - CTR
Well, firstly, usually you read about power plants, Kanishka brought up solar, or you look at it enhanced geothermal. It's actually about capacity factors, how many megawatt hours or terawatt hours you can put into the system in any given year, right? So if you divide that by total costs, you've got your upfront fuels already paid for, right? So we've got a perpetual fuel source that just keeps giving. I think the Salton Sea has proven that with 45 years of operating history without any heat or minerals deprivation after all of those years and it's one-off costs. So you start to see a flat curve and it's unfortunate you've got to generally model these on a 30 year model where you have 45, 50 to 100 years of sort of potential beyond of lifetime. So they are, it's levelized and you're not subject to variability. You're not subject to, as you recently probably read about, you know, the variability of natural gas pricing And all of these sorts of things, you can forecast as best you can. But with geothermal, it is front loaded. That's it. It's one off, right? You've got your lease and off you go. And you're basically with your CapEx, very low OpEx. These plants, again, besides a long history, you know, they're running 24 7. Like I said, you might take them off for scheduled servicing every now and then, but very reliable, very low risk.
Nick - Host
And so speaking of the front end of things, How far along are things in terms of the permitting and regulatory approval side of getting your first stages here in the running?
| 4 |
Rod - CTR
So we have our, for our first stage, first 50 MW plant, we have our conditional use permits. We're part of the federal Fast 41 program. You can go to the Fast 41 dashboard and track the project. And we have one more permit that's emitted, part of the 404 process. So we're basically ready to, as about as shovel ready as you get. And then beyond permitting all of our long lead equipment, the equipment that you would see in the world of natural gas or any type of base load power is, steam turbines now are close to 50 months. We have staged, we have Fuji Electric built our triple flash unit, 58 megawatt gross unit. It is sitting in Kawasaki in Japan. Right now, all of our separators, the switchgear, all the long lead equipment have done. We've also drilled 2 very large wells out there with a few more to be completed once we start construction. So all in all, we're about as shovel ready as you'll get.
Nick - Host
Great. And you know, as some people in the region are, I'm sure, quite familiar with, water usage is just such a big topic. And in this part of the country, particularly with the multiple states wrangling over the use of the Colorado River water specifically, how does any of that that impact your project? And has there been any kind of major movement in any of that dispute at all lately?
Rod - CTR
I think water, no matter how efficient we get with water, but water is quite de minimis for these power plants. I mean, we use a little bit of water in the dilution. So what you take out in steam, you really need to top back up in the reservoir management. The lithium process is no evaporation. So we're actually first class when it comes to lithium recovery or critical minerals recovery where we actually are using steam to concentrate critical minerals if that makes sense. So the commercial allocation to water is from the Imperial Irrigation District is about 25,000 acre feet per year. We'll use approximately 4 to 6,000 acre feet per year and the total use for the district is about 2.7 million acre feet per year. So we're probably, we are best in class when it comes to water use. However, in fundamental engineering, we actually recycle one gallon of water now eight times. I mean, that's how efficient we've got with our water use. It'll never be 0, but as about as on the world of power and critical minerals is quite efficient.
Nick - Host
And so looking at the timeline of how you plan on staging out your development, Why was it that you decided to go towards the geothermal power side of your general operations first and then with the lithium kind of coming in later in your phases of development?
Rod - CTR
Yeah, so geothermal power, I mean, we have always had a strategy of project by project. So power first, of course, you've got production wells if you think about it, you're bringing the brine up, we're using the power plant effectively to pretreat the brine, you know, cool the brine before reinjection and you're removing certain minerals from that brine before you get to lithium. So a power plant can sit on its own balance sheet. It can be built on its own. Clearly you need to build the power first before we build the minerals. It never rules out the fact that we can contemporaneously or slightly behind within, you know, a period of time develop the the critical minerals facilities behind the power plant. But in simple terms, the power plant must be built first. We generally commission that whilst we're either constructing or commissioning or depending on the stage and capital, access to capital of where we get to with critical minerals.
| 5 |
Nick - Host
And now for a quick break. Why Europe's back deal flow runs through Zurich this December. If you're a sponsor looking for targets, much of the pipeline worth watching right now is in Europe. Keebstar's merger with Cohen Circle Acquisition Corp One, SPAC Insider's deal of the year, showed that a large European company can reach US capital through a SPAC. Behind it sits companies in quantum computing, AI, defense tech, energy security, and Ukraine's reconstruction, and many of them are now weighing a US listing. On Thursday, December 10th, the Europe SPAC Summit at the Dolder Grand in Zurich puts those companies in one room with the people who can get them listed. A few reasons it's worth the trip. Targets you haven't met. CEOs and CFOs of European growth companies considering a US listing will be there, along with late-stage VC and PE firms looking for an exit for their portfolio companies. Capital in the room. Hedge funds, crossover funds, and family offices active in SPAC IPOs and pipes are attending. Zurich has one of Europe's deepest family office communities. Lessons from old deals. Keystar gives a keynote and executives from IQM, Terra Quantum, OpenPaid, and TrustDeal are among the speakers. One room, one day. About 350 sponsors, investors, bankers, and lawyers will spend the day together with time built in for real conversations. Attendance is free and by invitation. Company registrations must be approved by December 4th. Request an invitation at europespacsummit.com. The timeline is interesting on that, just given that, as you lay out in your investor materials, that there is, in the end, potentially a lot more value on the lithium side of the business than the power generation side, although that can bring nearer term revenues. Just as you're working through these different stages, what have you been able to find about the kind of the quality and the quantity of the lithium you're going to have access to as you go?
Rod - CTR
Yeah, so I think one of your earlier questions is the brine, right? Getting back to the brine itself, the brine is a chloride, naturally chloride brine stream. So what that means in simple terms, not every brine's like that or certainly hard rock type of mining, certainly not like that either. But the quality of what we produce, the base chemical is lithium chloride. So lithium chloride, we, and we have done this, we convert lithium chloride to carbonate and then ultimately to hydroxide. The market's telling us otherwise now we're descoping that slightly. So, so with what we've done, you know, we've, we've built a one in 15 scale plant, we run that plant for over 800 hours, we had Aquatec and then coke in Industries validate and run those run those facilities for a period of time and then subsequently had Baker Hughes author a SK 1300 definitive feasibility study on pretty much the full production not only the recovery of lithium which of course every other mine in the world sends it all to China we recover lithium but also convert that into a multiple products depending on what the customer is looking for.
| 6 |
Nick - Host
Great. So getting back to these stages, this SPAC transaction is ultimately going to be sort of one of the earlier fundraising steps that you're going to need in order to get fully through your full development plan. And there'll be different financing types sort of as you go. Could you walk us through what some of the next steps might look like in terms of, you know, or the mix of project financing and potentially other equity financing that's going to fuel different sections of this build out as you go?
Kanishka - Plum
Sure. So look, we have a staged sort of approach to financing. And what the really good part of the story is that a lot of our build out is modular. We can sort of focus on one module, finance it, get more financing, build out the next module. So it's built in stages. And so this initial stage that we're building out for power, we're raising an equity pipe around that. And that unlocks some project debt financing, which we are already talking to lenders about. We have, I think we just announced, I don't know if this is public, I think it is. We just announced BBVA as our partner to lead the financing on the project debt for the next chunk of project debt financing around $420 million. So all of this is staged and it's going to happen sequentially with the equity coming in first, sort of unlocking the project debt, unlocking stage one, and then we kind of go into stages two through four, starting with the power and then the lithium. For Plum, underwriting this thesis was very important because it gives us the ability to break this story into manageable sort of modules or chunks, and it doesn't have to be a all or nothing proposition. And as we raise capital, as we go public and raise more capital, this unlocks more and more upside. And we haven't even talked about, like we've talked about the power and lithium, but the brine is actually very rich with potassium and other critical minerals. Some of those things will be sort of play numbers three and four and five in the public markets that represent the upside. And that's the really interesting attractive part about underwriting this story for the long term. We want to make this a multi-decade platform in the public markets, and we feel like we're fortunate we're coming in at this point where everything is ready to go. Rod and team have done the really hard heavy lifting over the past decade, and we're bringing the financing and launching this rocket ship.
| 7 |
Nick - Host
Being some of the major advantages for that financing path and as you move forward of being a public company for those next stages.
Rod - CTR
Well, time and timing, I think access to capital, I think Nick's first and foremost. I mean, once we go public, we'll run out with an investment bank for our first series. And as Kanishka mentioned, this modularized approach, clearly getting back to one of your early questions about bringing power on is getting revenue up and running as quick as we can, right? We've already invested. $310 million to date in the project. And then, accessing the capital as required to get our stage one lithium and critical minerals underway. At the same time, we're working in parallel with, we've just received delivery of an engineering package from Baker Hughes on 6 100 megawatt net power units and a master plan wellfield. So we're starting to sort of see, you know, having access to large capital tranches and being able to deploy capital in a modularized approach that only oil and gas can bring to a project like this is extremely, I think, attractive where we can start to realize some of the other, not only just the actual mechanical components like more wells, more power plants, the actual streaming. I mean, the heavy lift, if you think about it, the heavy lifting is done. So if you think about picture the brine coming up, the brine gets cooled, we're pulling out minerals, you know, CO2 free cement is one of them, zinc, manganese, and then lithium. And then we're removing rubidium, cesium, you know, and other minerals. And then you get to potassium and then you re-inject or it's a stream, you can just take what you like and re-inject the balance. So Those types of opportunities, yes, there's equipment and yes, there's infrastructure associated with that. However, it's not a full development plan every time we do one of those, if that makes sense. So you've got blocks. So I think as we move forward, we'll end up sort of with a filing cabinet full of definitive feasibility studies or preliminary feasibility studies or offtake agreements or joint venture agreements with other parties that can come in and add value and we'll announce those. raise more capital and so on and so forth. So it gives us the ultimate flexibility, I think, on top of the access to the capital that's required to get a mega project like this out of the ground.
Kanishka - Plum
I'll just add one thing. Rod touched on this. The ability to attract industry partners here is key. And it's such an interesting project because we have 4,000 acres of land that we own. We own the subsurface rights. And we're developing this behind the meter power. And we have lithium and other critical minerals being extracted. But the 4,000 acres also gives us a lot of opportunity to bring in partners to co-locate other potential factories, data centers, go to market partners. And these are all conversations that the company is having. And we hope as a public company, with the presence more sort of known, this is going to become even, it's an undiscovered gem right now. And we think once the company is public and sort of some of the different paths to monetization across all of these different paths, it's going to be a really great public story for the next couple of decades as we kind of go after some of these paths.
| 8 |
Nick - Host
That's what I was going to just get to as well as kind of on the flip side of this, it's not only the the utility for Ctr. of having access to the public capital, but also this is a sort of story and certainly as a pure play project that public market investors don't typically. get the opportunity to invest in themselves. What do you see as being some of the kind of the major milestones that the kind of the market can kind of keep an eye on that are potential inflection points for the project as you move forward, as you've mentioned some of these reports coming out and other kind of markers along the path that are coming up for those to follow?
Rod - CTR
I think, you know, the fundamental milestones, one was announced, I believe, yesterday with BBBA's announcement of the $420 million lead for debt. And it's not so much the quantum of dollars, it's the due diligence that a major bank generally does on a project like this. You know, the resource validation, the power plant validation and everything else that goes with it. So I think there's a milestone that we're literally sitting on today that's active, you know, very live. The next milestone would be our public listing date. As we turn various terms from SEC, we do complete control on timing there, but it's imminent. And then you're following sort of sub milestones that you would carefully follow with FID. So final investment decision now that we have debt lined up, particularly on the power plant, offtake agreements and other parallel announcements that I think folks should keep an eye on would be announcements about other critical minerals and offtake agreements as we're moving forward. And that's really going to dictate then ultimate timing on funding for say, the lithium plant or other critical minerals and other partnerships. So we are trying to sort of mention using the filing cabinet scenario as a simple way of thinking about this where we have plenty of stories already filed away. We don't do anything until we have credible sign off and validation like we have with Baker Hughes, a definitive feasibility study or resource and reserve reports and things like that. And we'll continually announce when we're very comfortable of our next milestone that's coming up.
| 9 |
Nick - Host
So Rod, I mean, did you always envision this as being a public company eventually?
Rod - CTR
You know, we looked at public and IPO back in 21, 22. We spent a lot of money on public company readiness, you know, SOCs and all of those sorts of things. Timing wasn't right for us, particularly then the SPAC market wasn't right for us. And all things in life, we've seen this market now where it's heading right now with particularly hyperscales. We see what was going on, AI infrastructure, critical minerals, converging all at once. And the opportunity come up and we met with Plum, with Kanishka and the team, and we felt time and timing more than anything else. Now was the time to execute of all times, all of these years, 14 years, believe it or not. that we've never seen the big hand catch up with the little hand, so to speak. So that's, have we always envisioned that? No. I mean, probably been comfortable being a private company with good systems. However, again, as I mentioned earlier, access to capital, this massive growth opportunity that the whole world has seen, not just us. I mean, with AI and infrastructure around it is just off the charts. So we need to accelerate our development plans.
Nick - Host
And Kanishka, with all the various levels to this project, how did you go about putting a valuation on the company given how it's staged out and just the multiple resources at play?
Kanishka - Plum
Yeah, it's an interesting question because with the multiple areas that Ctr. is developing, there is no one pure play sort of comp that we looked at. But we did look at several different power comps because we're doing something similar in developing a geothermal resource. And we looked at lithium comps. And together, we sort of put those together in a sort of sum of the parts and came up with a structure for evaluation that made sense. ultimately, I think the underwriting of this project from a qualitative perspective was also important because, I've mentioned the demand curve that we're seeing on the power side as well as the lithium side. And those demand curves are just moving in one direction over the next couple of decades. But ultimately, it was attractive to us that this is not a science experiment. Rod mentioned the 45 years of operational history in the Salton Sea and 11 operational plants. But even more than that, DLE technology has been proven out with billions of dollars behind operational projects. But the fact that Ctr. went further actually got an independent third party Maker Hughes to do a definitive feasibility study with AquaTech to prove out all of the economics of this resource. And they spent $45 million in building and running a demonstration plant, 115th scale for 800 hours, to literally prove out soup to nuts how this would work. And now it just needs to scale. So this is the part that kind of gave us validation on the valuation and that these guys have actually not only going after the upside, but the execution path to that, they've kind of figured out the way to kind of do this. And so massive opportunity, multiple revenue streams, de-risked operations because they've done this at 115 scale, and then third party validation from all of the partners that have come in. So the full package kind of went into our valuation methodology.
| 10 |
Nick - Host
And so Rod, you've been working on this project for a long time now. What is the upcoming stage of this that is most exciting to you personally?
Rod - CTR
Actually, execution. You know, I mean, ordering the long lead equipment was one part and seeing all of that, if you want to use the term some of the parts, some of the equipment is extremely exciting. I think the timing, the timing in life, right? It's you'll see a couple of these opportunities every now and then. This one's just massive and it's so obvious. So I'm excited by execution. Everything Ctr. is doing now is building on its execution team. We've got folks coming on board in our Houston office, our Imperial office, really emphasis on execution, a world-class board that we will announce in the coming weeks. I mean, world-class, that it's attracting, and we're just attracting good people, good partners. I mentioned Baker Hughes, I mentioned Aquatect. We looked at our single flow sheet. Everything about us now is all about how do we averse risk Because that's all we're left to do is execute. That's a big part of it, but it's not about drilling. Is there a resource? It's not about what are we doing or how we're doing it. Kanishka mentioned we've done that. We've done the hard yards. And again, it's time for us to execute. It's whether that's the power, given the demand of what, 100 gigawatt shortfall now, globally, I think 50% of all demand by 2030 is going to be towards this hyperscale AI sort of situation. And of course, supporting that is critical minerals and infrastructure, lithium, 50%, nearly 50% of all lithium now is going towards the best battery market. So I think that's what's exciting to me. And doing scale and scalability is the key, bringing in the knowledge and background of big oil, like Baker Hughes, what you're going to see in Imperial Valley, the Hell's Kitchen project is another Odessa style project, 48 wells, the same pumps, the same pipes, the same steam turbines, not variable equipment. And that's where we get reliability. That's where we lower our levelized cost of energy, our levelized cost of critical minerals production. And all doing that, what really excites me is there's two other factors. There's social capital. We're in one of the most impoverished communities in the United States, high unemployment. And there's a saying out there, if you can operate a John Deere tractor with a power takeoff, you can do a part-time course, triple your income and come and work as an operator for companies like Ctr. or Berkshire Hathaway and others, and suddenly the kids are going to college. You know, there's that. And this is a new stream for the US. The US does not really produce too much of its own And I think there's a whole nother untapped resource there that's not properly measured.
| 11 |
Nick - Host
The views and opinions expressed on this podcast are those of the speakers and don't necessarily reflect those of SPAC Insider. This episode is for informational purposes only and is not investment, financial or legal advice, nor a recommendation or solicitation to buy or sell any security. Guests may discuss pending transactions, so do your own research and consult your own advisors before making any investment decision.
Additional Information and Where to Find It
In connection with the transactions contemplated by the Business Combination Agreement ("Proposed Transactions"), Plum IV and CTR intend to file with the SEC a registration statement on Form S-4 (as may be amended, the "Registration Statement"), which will include a preliminary proxy statement of Plum IV as well as a preliminary prospectus relating to the offer of securities to be issued to the stockholders of CTR (the "Proxy Statement/Prospectus"). After the Registration Statement is declared effective, a definitive proxy statement and other relevant documents will be mailed to shareholders of Plum IV as of the record date to be established for voting on the Proposed Transactions and other matters as described in the Proxy Statement/Prospectus. Plum IV will also file other documents regarding the Proposed Transactions with the SEC. This communication does not contain all of the information that should be considered concerning the Proposed Transactions and is not intended to form the basis of any investment decision or any other decision in respect of the Proposed Transactions. BEFORE MAKING ANY VOTING OR INVESTMENT DECISION, SHAREHOLDERS OF PLUM IV AND OTHER INTERESTED PARTIES ARE URGED TO READ, WHEN AVAILABLE, THE PRELIMINARY PROXY STATEMENT/PROSPECTUS, AND AMENDMENTS THERETO, AND THE DEFINITIVE PROXY STATEMENT/PROSPECTUS AND ALL OTHER RELEVANT DOCUMENTS FILED OR THAT WILL BE FILED WITH THE SEC IN CONNECTION WITH PLUM IV'S SOLICITATION OF PROXIES FOR THE EXTRAORDINARY GENERAL MEETING OF ITS SHAREHOLDERS TO BE HELD TO APPROVE THE PROPOSED TRANSACTIONS AND OTHER MATTERS AS DESCRIBED IN THE PROXY STATEMENT/PROSPECTUS BECAUSE THESE DOCUMENTS WILL CONTAIN IMPORTANT INFORMATION ABOUT PLUM IV, CTR AND THE PROPOSED TRANSACTIONS. Investors and security holders will also be able to obtain copies of the Registration Statement and the Proxy Statement/Prospectus and all other documents filed or to be filed with the SEC by Plum IV, without charge, once available, on the SEC's website at www.sec.gov or by directing a request to: Plum Acquisition Corp. IV, 2021 Fillmore St., #2089, San Francisco, California 94115, Attention: Kanishka Roy, or by email at [email protected].
| 12 |
Participants in the Solicitation
Plum IV, CTR and their respective directors and executive officers may be deemed participants under SEC rules in the solicitation of proxies from Plum IV's shareholders in connection with the Proposed Transactions. A list of the names of such directors and executive officers, and information regarding their interests in the Proposed Transactions and their ownership of Plum IV's securities is, or will be, contained in Plum IV's filings with the SEC. Additional information regarding the interests of the persons who may, under SEC rules, be deemed participants in the solicitation of proxies from Plum IV's shareholders in connection with the Proposed Transactions, including the names and interests of CTR's directors and executive officers, will be set forth in the Proxy Statement/Prospectus, which is expected to be filed by Plum IV and CTR with the SEC. Investors and security holders may obtain free copies of these documents as described above.
No Offer or Solicitation
This communication is for informational purposes only and is not a proxy statement or solicitation of a proxy, consent or authorization with respect to any securities or in respect of the Proposed Transactions and shall not constitute an offer to sell or exchange, or a solicitation of an offer to buy or exchange the securities of Plum IV or CTR, or any commodity or instrument or related derivative, nor shall there be any sale of any such securities in any state or jurisdiction in which such offer, solicitation, sale or exchange would be unlawful prior to registration or qualification under the securities laws of any such state or jurisdiction. This communication is not, and under no circumstances is to be construed as, a prospectus, an advertisement or a public offering of the securities described herein in the United States or any other jurisdiction. No offer of securities shall be made except by means of a prospectus meeting the requirements of the Securities Act or an exemption therefrom. Investors should consult with their counsel as to the applicable requirements for a purchaser to avail itself of any exemption under the Securities Act.
Forward-Looking Statements
This communication contains certain forward-looking statements within the meaning of the U.S. federal securities laws with respect to the Proposed Transactions and the parties thereto. All statements contained in this communication other than statements of historical fact, including, without limitation, statements regarding the Proposed Transactions between Plum IV and CTR and the planned PIPE in connection with the Proposed Transactions; the anticipated benefits and timing of the Proposed Transactions; expected trading of the combined company's securities on the Nasdaq; the building of CTR's flagship Hell's Kitchen Project; the anticipated benefits and timing of CTR's flagship Hell's Kitchen Project, the combined company's future financial performance; the ability of the combined company to execute its business strategy, its market opportunity and positioning; and other statements regarding management's intentions, beliefs, or expectations with respect to the combined company's future performance, are forward-looking statements. Forward-looking statements are often identified by the use of words such as "anticipate," "believe," "continue," "could," "estimate," "expect," "intend," "may," "might," "plan," "potential," "predict," "project," "should," "will," "would," and similar expressions, but the absence of these words does not mean that a statement is not forward-looking.
| 13 |
These forward-looking statements are based on the current expectations and assumptions of Plum IV and CTR and are subject to risks and uncertainties that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. Such risks and uncertainties include, but are not limited to: (1) the occurrence of any event, change or other circumstances that could give rise to the termination of the Business Combination Agreement; (2) the outcome of any legal proceedings that may be instituted against the parties following the announcement of the Proposed Transactions and any definitive agreements with respect thereto; (3) the inability to complete the Proposed Transactions, including due to failure to obtain approval of the shareholders of Plum IV and CTR or other conditions to closing and the inability to complete the planned PIPE; (4) the risk that the Proposed Transactions may not be completed by Plum IV's business combination deadline; (5) the inability to maintain the listing of Plum IV's securities or to obtain or maintain the listing of the combined company's securities on the Nasdaq, the New York Stock Exchange, or another national securities exchange following the Proposed Transactions; (6) the risk that the Proposed Transactions disrupts CTR's current plans, business relationships, performance, operations and business generally as a result of the announcement and consummation of the Proposed Transactions; (7) the risk that the price of the combined company's securities may be volatile due to a variety of factors, including changes in laws, regulations, technologies, natural disasters, geopolitical tensions, and macro-economic and social environments affecting its business; (8) the ability to recognize the anticipated benefits of the Proposed Transactions, which may be affected by, among other things, competition, the ability of the combined company to grow and manage growth profitably and retain its key employees; (9) costs related to the Proposed Transactions; (10) changes in applicable laws or regulations; (11) risks related to CTR's business, including fluctuations in demand and prices for lithium and other critical minerals, competition within the industry, the risks inherent in development projects and exploration activities, potential delays or cost overruns in capital expenditures, the ability to secure necessary raw materials, compliance with regulatory requirements, environmental and safety obligations, economic and market conditions, and political or geopolitical developments; and (12) other risks detailed from time to time in Plum IV's filings with the SEC, including the Registration Statement and related documents filed or to be filed in connection with the Proposed Transactions.
The foregoing list of risk factors is not exhaustive. You should carefully consider the foregoing factors and the other risks and uncertainties described in the "Risk Factors" section of Plum IV's Annual Report on Form 10-K filed with the SEC on March 31, 2026, subsequent Quarterly Reports on Form 10-Q and the Registration Statement and Proxy Statement/Prospectus that will be filed by Plum IV and CTR, and other documents filed by Plum IV from time to time with the SEC, as well as the list of risk factors included herein. These filings identify and address other important risks and uncertainties that could cause actual results to differ materially from those contained in the forward-looking statements. Additional risks and uncertainties not currently known or that are currently deemed immaterial may also cause actual results to differ materially from those expressed or implied by such forward-looking statements. Readers are cautioned not to put undue reliance on forward-looking statements, and none of the parties or any of their representatives assumes any obligation and do not intend to update or revise these forward-looking statements, each of which is made only as of the date of this communication.
| 14 |