MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
Discussion of financial condition and liquidity for NSP-Wisconsin is omitted per conditions set forth in General Instructions H(1)(a) and (b) of Form 10-Q for wholly owned subsidiaries. It is replaced with management's narrative analysis of the results of operations set forth in General Instruction H(2)(a) of Form 10-Q for wholly owned subsidiaries (reduced disclosure format).
Non-GAAP Financial Measures
The following discussion includes financial information prepared in accordance with GAAP, as well as certain non-GAAP financial measures such as ongoing earnings. Generally, a non-GAAP financial measure is a measure of a company's financial performance, financial position or cash flows that adjusts measures calculated and presented in accordance with GAAP.
NSP-Wisconsin's management uses non-GAAP measures for financial planning and analysis, for reporting of results to the Board of Directors, in determining performance-based compensation and communicating its earnings outlook to analysts and investors. Non-GAAP financial measures are intended to supplement investors' understanding of our performance and should not be considered alternatives for financial measures presented in accordance with GAAP. These measures are discussed in more detail below and may not be comparable to other companies' similarly titled non-GAAP financial measures.
Earnings Adjusted for Certain Items (Ongoing Earnings)
Ongoing earnings reflect adjustments to GAAP earnings (net income) for certain items.
We use this non-GAAP financial measure to evaluate and provide details of NSP-Wisconsin's core earnings and underlying performance. We believe this measurement is useful to investors to evaluate the actual and projected financial performance and contribution of NSP-Wisconsin. For the three and nine months ended Sept. 30, 2025 and 2024, there were no such adjustments to GAAP earnings and therefore GAAP earnings equal ongoing earnings.
Results of Operations
NSP-Wisconsin's net income was $111 million and $107 million for the nine months ended Sept. 30, 2025 and 2024, respectively. The change was driven by higher recovery of electric and natural gas infrastructure investments, which was offset by increased depreciation and O&M expenses.
Electric Revenue
Electric revenues are impacted by fluctuations in the price of natural gas, coal and uranium, regulatory outcomes, market prices and seasonality.
(Millions of Dollars) Nine Months Ended Sept. 30, 2025 vs. 2024
Interchange agreement revenue from NSP-Minnesota $ 15
Estimated impact of weather 8
Recovery of lower cost of electric fuel and purchased power (5)
Other, net 5
Total increase $ 23
Natural Gas Revenues
Natural gas revenues vary with changing sales and the cost of natural gas and regulatory outcomes.
(Millions of Dollars) Nine Months Ended Sept. 30, 2025 vs. 2024
Recovery of higher cost of natural gas $ 13
Estimated impact of weather 5
Total increase $ 18
Cost of Natural Gas Sold and Transported - Expenses incurred for the cost of natural gas sold are impacted by market prices and seasonality. These costs are generally recovered through various regulatory recovery mechanisms. As a result, changes in these expenses are largely offset in operating revenues and have minimal earnings impact.
Natural gas sold and transported increased $11 million year to date. The increase was primarily due to increased commodity prices and volumes.
Non-Fuel Operating Expenses and Other Items
O&M Expenses - O&M expenses increased $11 million year to date, primarily due to increased interchange agreement billings with NSP-Minnesota and benefits costs.
Depreciation and Amortization - Depreciation and amortization increased $12 million year to date, primarily due to system expansion.
Public Utility Regulation and Other
The FERC and various state and local regulatory commissions regulate NSP-Wisconsin. The electric and natural gas rates charged to customers of NSP-Wisconsin are approved by the FERC or the regulatory commissions in the states in which it operates.
Rates are designed to recover plant investment, operating costs and an allowed return on investment. NSP-Wisconsin requests changes in utility rates through commission filings.
Changes in operating costs can affect NSP-Wisconsin's financial results, depending on the timing of rate case filings and implementation of final rates. Other factors affecting rate filings are new investments, sales, conservation and demand side management efforts, and the cost of capital. In addition, the regulatory commissions authorize the ROE, capital structure and depreciation rates in rate proceedings. Decisions by these regulators can significantly impact NSP-Wisconsin's results of operations.
Except to the extent noted below, the circumstances set forth in Public Utility Regulation included in Item 7 of NSP-Wisconsin's Annual Report on Form 10-Kfor the year ended Dec. 31, 2024 appropriately represent, in all material respects, the current status of public utility regulation and are incorporated herein by reference.
Pending and Recently Concluded Regulatory Proceedings
Excess Liability Insurance Deferral- In February 2025, NSP-Wisconsin filed a request with the PSCW for deferred accounting treatment for excess liability insurance expense of $9.6 million incurred as a result of the October 2024 policy renewal. The PSCW verbally approved the request in August 2025.
Wisconsin Electric and Natural Gas Rate Case - In March 2025, NSP-Wisconsin filed a request with the PSCW for a multi-year electric and natural gas rate increase.
For the electric utility, NSP-Wisconsin is seeking a total electric revenue increase of $94 million (11.8%) in 2026 and an incremental $57 million (7.1%) in 2027, for a total of $151 million over the two-year period of 2026 and 2027. The electric rate increase is based on electric rate base of $2.9 billion in 2026 and $3.2 billion in 2027. For the natural gas utility, NSP-Wisconsin requested a total natural gas revenue increase of $20 million (12.7%) in 2026 and an incremental $4 million (1.5%) in 2027, for a total of $24 million (14.2%) over the two-year period of 2026 and 2027. The natural gas rate increase is based on natural gas rate base of $0.3 billion in 2026 and $0.4 billion in 2027. Both the electric and natural gas rate requests are based on forward-looking test years, with a 10.0% ROE and an equity ratio of 53.5%. 
On August 8, 2025, the PSCW Staff and intervenors filed their direct testimony. The PSCW Staff recommended an electric base rate increase of $115 million or 14.4% over the two-year period. The PSCW Staff additionally recommended a natural gas rate increase of $21 million, or 12.3% over the two-year period, all based on a ROE of 9.7% and an equity ratio of 53.5%.
Intervenors mainly limited their comments on revenue requirements to ROE focusing the majority of their testimony on cost of service, rate design and other policy issues. The major components of the PSCW Staff recommendation are summarized below:
(Millions of Dollars)
Electric
Natural Gas
NSP-Wisconsin's filed two-year rate request
$ 151 $ 24
PSCW Staff recommended adjustments:
Capital investments (a)
(15)
(1)
ROE adjustment
(7)
(1)
O&M expenses
(6)
(1)
Nuclear decommissioning accrual update (b)
(6)
-
Other, net
(2)
-
Proposed revenue change
$ 115 $ 21
(a)Capital investment adjustment includes $7 million associated with two MISO LRTP projects that are pending PSCW approval (Grid Forward and Western Wisconsin Transmission Connection). It is PSCW Staff historic practice to recommend adjustments for projects until Commission approval is received. Approval of both LRTP projects is anticipated in the fourth quarter of 2025.
(b)Since filing the case, the Minnesota Public Utilities Commission authorized a reduction to the annual nuclear decommissioning accrual. This reduction, which flows to NSP-Wisconsin through the interchange agreement, reduced the NSP-Wisconsin rate request and is earnings neutral.
A PSCW decision is anticipated in the fourth quarter of 2025.
Michigan Natural Gas Rate Case - In July 2025, NSP-Wisconsin filed a natural gas rate case in Michigan, seeking a revenue increase of $2.2 million. An MPSC decision is expected in early 2026.
NSP System
NSP-Minnesota and NSP-Wisconsin are actively engaged in multiple processes and proceedings to acquire resources to meet their identified generation resource needs.
In October 2023, NSP-Minnesota issued an RFP seeking 1,200 MW of wind assets to replace capacity and reutilize interconnection rights associated with the retiring Sherco coal facilities. The RFP closed in December 2023. NSP-Minnesota expects to file for approval of recommended projects in early 2026.
In 2024, NSP-Minnesota and NSP-Wisconsin each issued an RFP collectively seeking up to 1,600 MW of wind, solar, storage or hybrid resources to interconnect to the NSP System, including reutilization of the interconnection rights associated with the retiring Sherco coal units, and 650 MW of solar and storage resources to specifically reutilize the interconnection rights associated with the retiring King coal unit. NSP-Minnesota and NSP-Wisconsin announced the short listed projects in January 2025 and plan to file for the requisite approvals of the selected resources with the MPUC and PSCW, respectively, in the fourth quarter of 2025.
NSP-Minnesota and NSP-Wisconsin will continue to file additional RFPs throughout 2025 and 2026 for resource needs approved as part of the 2024 Upper Midwest Resource Plan.
Other
Supply Chain
NSP-Wisconsin's ability to meet customer energy requirements and growing customer demand, respond to storm-related disruptions, and execute our capital expenditure program are dependent on maintaining an efficient supply chain.
Large global demand for energy-related infrastructure has stretched equipment supply chains, extended delivery dates and increased prices for items like combustion turbines, transformers and other large electrical equipment. The labor market for skilled engineering and construction resources to build renewables and gas generation has also been strained, impacting cost and availability.
In addition, manufacturing processes have experienced disruptions related to the scarcity of certain raw materials and interruptions in production and shipping. The impact of inflationary pressures, geopolitical events and federal policies have exacerbated the situation. NSP-Wisconsin continues to monitor the situation as it remains fluid and seeks to mitigate the impacts by securing alternative suppliers and key vendor partners, increasing procurement lead times, modifying design standards, and adjusting the timing of work.
Tariffs, Trade Complaints and Federal Actions
Several trade cases related to anti-dumping and countervailing duty investigations are ongoing and we continue to monitor the potential impacts of these cases.
In 2025, several executive orders have been issued imposing new global and country-specific tariffs on many imports, which may impact our procurement and development activities. Additionally, executive orders and actions from government agencies may impact the permitting of wind and solar facilities and the retirement of coal facilities.
NSP-Wisconsin continues to assess the impacts of these tariffs, executive orders, trade complaints and federal policies on its business, including company owned projects and PPAs. NSP-Wisconsin may seek regulatory relief, if required, in its jurisdictions.
Continued and/or further policy actions or other restrictions, disruptions in imports from key suppliers, or any new trade complaint could impact viability, timelines and costs of various projects and PPAs.
Tax Law Changes
On July 4, 2025, the President signed into law Public Law No. 119-21 (the "OBBB"). The OBBB modifies certain clean energy tax provisions included in the Inflation Reduction Act. The provisions include:
Eliminating production and investment tax credits for wind and solar facilities placed in service after 2027, for facilities that begin construction after July 4, 2026.
The addition of foreign entity of concern rules that apply to projects commencing construction after 2025.
In August 2025, the U.S. Treasury issued further guidance related to the beginning of construction for clean energy projects.
NSP-Wisconsin does not expect these provisions to have an impact on our 2026-2030 base capital plan, as steps have been taken to begin construction under the IRS' safe harbor guidance.
Environmental Regulation
Throughout 2025, the EPA has announced various regulatory actions addressing a wide range of environmental regulations. NSP-Wisconsin will continue to monitor these proposed rules as they move toward final action. Additionally, any other amendments and changes to rules will be evaluated as proposed by the EPA.
Clean Air Act
Power Plant Greenhouse Gas Regulations -In April 2024, the EPA published final rules addressing control of CO2emissions from the power sector. The rules regulate new natural gas generating units and emission guidelines for existing coal and certain natural gas generation. The rules create subcategories of coal units based on planned retirement date and subcategories of natural gas combustion turbines and combined cycle units based on utilization. The CO2control requirements vary by subcategory.
Based on current estimates and assumptions, NSP-Wisconsin has determined that due to scheduled plant retirements, there is minimal financial or operational impact associated with these requirements and believes that the cost of these initiatives or replacement generation would be recoverable through rates based on prior state commission practices.
In June 2025, the EPA proposed to repeal these and all other GHG emissions standards for the power sector. In the alternative, the EPA proposed to repeal a narrower subset of the 2024 regulations.
In July 2025, the EPA additionally proposed to repeal the 2009 Endangerment Finding and associated regulations addressing GHG emissions under the Clean Air Act. NSP-Wisconsin will monitor the proposed rules and evaluate the impacts of any final rule.
In September 2025, the EPA proposed to amend the Clean Air Act GHG Reporting Program to scale back reporting and recordkeeping requirements. Under the amended program, NSP-Wisconsin would no longer be required to report GHG emissions to the federal program. NSP-Wisconsin will continue to report GHG emissions as required under state programs. NSP-Wisconsin will monitor the proposed rule and evaluate the impacts of any final rule upon state reporting programs.
Waste-to-Energy Air Regulations - In January 2024, the EPA proposed air regulations addressing new and existing large municipal waste combustors. The proposed rules lower current emission standards for certain pollutants and would require installation of new pollution controls and/or more intense use of existing pollution controls at French Island Generating Station. Until final rules are issued, it is not certain what the impact will be on NSP-Wisconsin. NSP-Wisconsin believes that the cost of these initiatives or replacement generation would be recoverable through rates based on prior state commission practices.
Emerging Contaminants of Concern
PFAS are man-made chemicals that are widely used in consumer products and can persist and bio-accumulate in the environment. NSP-Wisconsin does not manufacture PFAS, but because PFAS are so ubiquitous in products and the environment, it may impact our operations.
In June 2024, the EPA finalized a rule that designated certain PFAS as hazardous substances under CERCLA. In July 2024, the EPA finalized another rule that set enforceable drinking water standards for certain PFAS.
Potential costs for these rules and any additional proposed regulations related to PFAS are uncertain and will be determined on a site specific basis where applicable. If costs are incurred, NSP-Wisconsin believes the costs will be recoverable through rates based on prior state commission practices.
Northern States Power Company published this content on October 30, 2025, and is solely responsible for the information contained herein. Distributed via Edgar on October 30, 2025 at 18:17 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]