City of Carrollton, TX

03/01/2026 | Press release | Distributed by Public on 03/01/2026 16:08

NTTA Closure of EB PGBT to NB & SB DNT Direct-Connectors

NTTA TRAFFIC ADVISORY

Overnight Closures for NTTA Maintenance: These closures are needed for roadway repairs.

Sunday, March 1 to Monday, March 2 from 10 p.m. to 5 a.m. (Overnight).

  • Eastbound President George Bush Turnpike (PGBT) to north- and southbound Dallas North Tollway (DNT) direct-connector ramp

Detours:

  • Northbound DNT: Drivers will take the Midway Rd./Rosemeade Pkwy. exit and turn left onto Midway Rd. Drivers will make a right at Park Blvd. and continue to Dallas Pkwy, turn left onto Dallas Pkwy. and follow signs to enter northbound DNT.
  • Southbound DNT: Drivers will take the Midway Rd./Rosemeade Pkwy. exit and turn right onto Midway Rd. Drivers will make a left onto Frankford Rd. and then right onto Dallas Pkwy. and follow signs to enter southbound DNT.

See map for additional information.

Message boards will be placed nearby to alert drivers of the closure.

All closures are subject to weather conditions and will be postponed, if necessary. Use caution in the construction area.

For more information about upcoming lane closures and traffic-related news along NTTA roadways, go to the visit Traffic Updates on ntta.org.


NTTA Closure of IH-35E NB to EB & WB PGBT Direct-Connectors
01/19/2026 2:40 PM

NTTA TRAFFIC ADVISORY

Nightly Closures for TDOT I-35E Phase 2 Project:

These closures are needed to perform drainage work.

Monday, January 19 to Wednesday, January 21 from 8 p.m. to 5 a.m. (Overnight).

  • Northbound I-35-E to east- and westbound President George Bush Turnpike (PGBT) direct-connector ramps

Detours:

  • Eastbound PGBT: Drivers will take the Frankford Road/Haverwood Lane exit, then turn left onto Frankford Road. They will then turn right onto Midway Road and turn left at PGBT to merge onto westbound PGBT.
  • Westbound PGBT: Drivers will take the Sandy Lake Road exit and turn left onto Sandy Lake Road. They will turn left onto the PGBT frontage road and follow the signs to enter PGBT.

See map for additional information.

Message boards will be placed nearby to alert drivers of the closure.

All closures are subject to weather conditions and will be postponed, if necessary. Use caution in the construction area.

For more information about upcoming lane closures and traffic-related news along NTTA roadways, go to the visit Traffic Updates on ntta.org.


City of Carrollton, TX published this content on March 01, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on March 01, 2026 at 22:08 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]